IGLC.net EXPORT DATE: 19 April 2024 @CONFERENCE{Carneiro2017, author={Carneiro, Juliana Quinderé and Carneiro, André Quinderé and Machado, Vitor Arruda and Cândido, Luis Felipe and Neto, José de Paula Barros }, editor={ }, title={Lean Metric System: Proposal for a Performance Measurement System for Construction Projects.}, journal={25th Annual Conference of the International Group for Lean Construction}, booktitle={25th Annual Conference of the International Group for Lean Construction}, year={2017}, pages={629-636}, url={http://www.iglc.net/papers/details/1398}, doi={10.24928/2017/0306}, affiliation={Civil Engineer at Aval Engineering, Brazil, juliana@avalengenharia.eng.br ; CEO, Aval Engineering, Brazil, andre@avalengenharia.eng.br ; CEO, Aval Engineering, Brazil, vitor@avalengenharia.eng.br ; Professor, Christus University Center (UNICHRISTUS), Brazil, luiscandido2015@gmail.com ; Professor, Federal University of Ceará (UFC), Brazil, jpbarros@ufc.br }, abstract={The application of Information Technology (IT) for the constructions management is mentioned as an important success factor. Improved IT management tools can help reduce important issues such as information gathering, misrepresentation, and lack of process standardization. These issues are related to the information flow and transparency, one of the principles of Lean Construction (LC), which will be explored in this research. This paper aims to present the development of a Performance Measurement System (PMS) with IT application, named Lean Metric (LM). Developed for the application of construction projects, LM uses concepts of hierarchical planning to monitor the constructions term and cost, based on information collected at the construction site. The LM was developed and tested in the last three years by a consulting company of planning and control of constructions in Fortaleza city. Its creation was crucial to increase the company's competitiveness, reducing operational costs and increasing confidence in the collected data. In addition, indicators are automatically calculated in real time, resulting in transparency in project results. }, author_keywords={Project Control, Lean Construction, Project Management }, address={ Heraklion, Greece }, issn={2309-0979 }, publisher={ }, language={English}, document_type={Conference Paper}, source={IGLC}, }