Skip to content

IGLC Portal

Sections
Personal tools
You are here: Home » Conferences » 2005 » Papers

IGLC 13, Sydny

Document Actions

Theory 1

Court, Pasquire, Gibb, Bower: “LEAN” AS AN ANTIDOTE TO LABOUR COST ESCALATION ON COMPLEX MECHANICAL AND ELECTRICAL PROJECTS
 
Macomber, Howell, Reed:  MANAGING PROMISES WITH THE LAST PLANNER SYSTEM: CLOSING IN ON UNINTERRUPTED FLOW

Vrijhoef, Koskela: REVISITING THE THREE PECULIARITIES OF PRODUCTION IN CONSTRUCTION

Ballard: CONSTRUCTION: ONE TYPE OF PROJECT PRODUCTION SYSTEM

Koskela, Kagioglou: ON THE METAPHYSICS OF PRODUCTION

Theory 2

Kärnä, Junnonen: PROJECT FEEDBACK AS A TOOL FOR LEARNING

Emmitt, Sander, Christoffersen: THE VALUE UNIVERSE: DEFINING A VALUE BASED APPROACH TO LEAN CONSTRUCTION

Bertelsen, Koskela: APPROACHES TO MANAGING COMPLEXITY IN PROJECT PRODUCTION

Bertelsen, Emmitt: THE CLIENT AS A COMPLEX SYSTEM


Bertelsen: MODULARIZATION—A THIRD APPROACH TO MAKING CONSTRUCTION LEAN?

Valence:PRODUCTION THEORY AND CONSTRUCTION PRODUCTIVITY

Supply chain management

Koerckel, Ballard: RETURN ON INVESTMENT IN CONSTRUCTION INNOVATION—A LEAN CONSTRUCTION CASE STUDY

Bulhões, Picchi, Granja: COMBINING VALUE STREAM AND PROCESS LEVELS ANALYSIS FOR CONTINUOUS FLOW IMPLEMENTATION IN CONSTRUCTION


Khalfan, Asad, McDermott: TOWARDS DEMAND AND SUPPLY MANAGEMENT IN CONSTRUCTION INDUSTRY

Pasqualini, Zawislak: VALUE STREAM MAPPING IN CONSTRUCTION: A CASE STUDY IN A BRAZILIAN CONSTRUCTION COMPANY

Toolanen, Olofsson, Johansson: TRANSPARENCY AND COOPERATION—ESSENTIAL FACTORS OF LEAN CONTRACTING

IT support

Woksepp, Olofsson, Jongeling: DESIGN REVIEWS AND DECISION-MAKING USING COLLABORATIVE VIRTUAL REALITY PROTOTYPES; A CASE STUDY OF THE LARGE-SCALE MK3 PROJECT

Khanzode, Fischer, Reed: CASE STUDY OF THE IMPLEMENTATION OF THE LEAN PROJECT DELIVERY SYSTEM (LPDS) USING VIRTUAL BUILDING TECHNOLOGIES ON A LARGE HEALTHCARE PROJECT

Loría-Arcila, Vanegas: ISSUES AFFECTING THE FLOW OF INFORMATION DURING THE DESIGN PHASE OF AFFORDABLE HOUSING DEVELOPMENTS

Rischmoller, Alarcón: USING LEAN PRINCIPLES AS A FRAMEWORK TO STUDY INFORMATION TECHNOLOGY IN CONSTRUCTION

Simonsson, Carlswärd: EVALUATION OF A GPS SUPPORT SYSTEM FOR FLEET MANAGEMENT CONTROL

Production planning and control

Henrich, Tilley, Koskela: CONTEXT OF PRODUCTION CONTROL IN CONSTRUCTION

Arbulu, Koerckel, Espana: LINKING PRODUCTION-LEVEL WORKFLOW WITH MATERIALS SUPPLY

Nakagawa: IMPORTANCE OF STANDARD OPERATING PROCEDURE DOCUMENTS AND VISUALIZATION TO IMPLEMENT LEAN CONSTRUCTION

Sacks, Goldin, Derin: PULL-DRIVEN CONSTRUCTION OF HIGH-RISE APARTMENT BUILDINGS

Granja, Picchi, Robert: TARGET AND KAIZEN COSTING IN CONSTRUCTION

Mitropoulos: ‘PLANNED WORK READY’: A PROACTIVE METRIC FOR PROJECT CONTROL

Flowline

Kenley: DISPELLING THE COMPLEXITY MYTH: FOUNDING LEAN CONSTRUCTION ON LOCATION-BASED PLANNING

Seppänen, Kenley: USING LOCATION-BASED TECHNIQUES FOR COST CONTROL

Seppänen, Kenley: PERFORMANCE MEASUREMENT USING LOCATIONBASED STATUS DATA

Seppänen, Aalto: A CASE STUDY OF LINE-OF-BALANCE BASED SCHEDULE PLANNING AND CONTROL SYSTEM

Shen, Chua: IMPACT OF VARIABILITY ON CONSTRUCTION SCHEDULES

Product development

Tilley: LEAN DESIGN MANAGEMENT—A NEW PARADIGM FOR MANAGING THE DESIGN AND DOCUMENTATION PROCESS TO IMPROVE QUALITY?

Björnfot, Stehn: PRODUCT DESIGN FOR IMPROVED MATERIAL FLOW—A MULTI-STOREY TIMBER HOUSING PROJECT

Tzortzopoulos, Chan, Kagioglou, Cooper, Dyson: INTERACTIONS BETWEEN TRANSFORMATIONS - FLOW AND VALUE AT THE DESIGN FRONT-END FOR PRIMARY HEALTHCARE FACILITIES

Höök, Stehn: CONNECTING LEAN CONSTRUCTION TO PREFABRICATION COMPLEXITY IN SWEDISH VOLUME ELEMENT HOUSING

Brookes: THEORY & PRACTICE OF MODULAR COORDINATION

Leite, Miron, Formoso: OPPORTUNITIES FOR CLIENT REQUIREMENTS MANAGEMENT IN LOW-INCOME HOUSE BUILDING PROJECTS IN BRAZIL

Management of people and teams

Orr: LEAN LEADERSHIP IN CONSTRUCTION

Zuo, Zillante: PROJECT CULTURE WITHIN CONSTRUCTION PROJECTS: A LITERATURE REVIEW

Buch, Sander: FROM HIERARCHY TO TEAM—BARRIERS AND REQUIREMENTS IN RELATION TO A NEW ORGANISATION OF BUILDING SITES

Strategy and implementation

Alarcón, Diethelm, Rojo, Calderon: ASSESSING THE IMPACTS OF IMPLEMENTING LEAN CONSTRUCTION

Jørgensen, Emmitt, Ballard: DIVERGENT FOCUS IN THE APPLICATION OF LEAN IDEAS: EXAMPLES FROM DENMARK AND CALIFORNIA

Kim, Jang: CASE STUDY - AN APPLICATION OF LAST PLANNER TO HEAVY CIVIL CONSTRUCTION IN KOREA

Bortolazza, Costa, Formoso: A QUANTITATIVE ANALYSIS OF THE IMPLEMENTATION OF THE LAST PLANNER SYSTEM IN BRAZIL

Mohan, Iyer: EFFECTIVENESS OF LEAN PRINCIPLES IN CONSTRUCTION

Dahl, Horman, Riley: LEAN PRINCIPLES TO INJECT OPERATIONS KNOWLEDGE INTO DESIGN

Prefab assembly and open building

Polat, Ballard: COMPARISON OF THE ECONOMICS OF ON-SITE AND OFF-SITE FABRICATION OF REBAR IN TURKEY

Polat, Ballard: WHY IS ON-SITE FABRICATION OF CUT & BENT REBAR PREFERRED IN TURKEY?

Cuperus, Napolitano: OPEN BUILDING/ LEAN CONSTRUCTION EVALUATION OF A CASE IN BRAZIL

Hardie, Miller, Manley: INNOVATIVE CONNECTING SYSTEM FOR PRECAST CONCRETE PLANKS ON A MAJOR SPORTS STADIUM

Lessing, Stehn, Ekholm: INDUSTRIALISED HOUSING - DEFINITION AND CATEGORIZATION OF THE CONCEPT

Pasquire, Gibb, Blismas: WHAT SHOULD YOU REALLY MEASURE IF YOU WANT TO COMPARE PREFABRICATION WITH TRADITIONAL CONSTRUCTION?

Benjaoran, Dawood: AN APPLICATION OF ARTIFICIAL INTELLIGENCE PLANNER FOR BESPOKE PRECAST CONCRETE PRODUCTION PLANNING: A CASE STUDY

Safety quality and environment

Marosszeky, Karim, Perera, Davis: IMPROVING WORK FLOW RELIABILITY THROUGH QUALITY CONTROL MECHANISMS

Sacks, Rozenfeld, Rosenfeld: LEAN SCHEDULING FOR SAFETY - DEVELOPMENT OF A TIME-DEPENDENT RISK LEVEL MODEL

Saurin, Formoso, Cambraia, Howell: A COGNITIVE SYSTEMS ENGINEERING PERSPECTIVE OF CONSTRUCTION SAFETY

Saha, Hardie: CULTURE OF QUALITY AND THE AUSTRALIAN CONSTRUCTION INDUSTRY

Luo, Riley, Horman: LEAN PRINCIPLES FOR PREFABRICATION IN GREEN DESIGN-BUILD (GDB) PROJECTS

Created by rcodinhoto
Last modified 2007-09-20 05:47 PM
« January 2009 »
Su Mo Tu We Th Fr Sa
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
 
 

Powered by Plone