TY - CONF TI - A Production Control Tool for Coordination of Teams, Meetings and Managerial processes C1 - Perth, Australia C3 - 23rd Annual Conference of the International Group for Lean Construction SP - 113 EP - 122 PY - 2015 AU - Zegarra, Omar AU - Alarcón, Luis Fernando AD - PhD Candidate and Graduate Researcher at Centro de Excelencia en Gestión de Producción (GEPUC) at Pontificia Universidad Católica de Chile. E-mail:ozegarra@uc.cl, (56 2) 354-4244 AD - PhD, Professor, Dep. of Construction Management Pontificia Universidad Católica de Chile, Email: lalarcon@ing.puc.cl, (56 2) 354-4201, (56 2) 354 4244. ED - Seppänen, Olli ED - González, Vicente A. ED - Arroyo, Paz AB - During construction projects, the productive deployment of operations depends on the reliable supply of the production control function, where the proper coordination of teams, meetings and managerial processes is crucial for performance. Currently the use of the Last Planner System for providing this function has been successful; despite the importance it claims in the social domain, it does not explicitly regulate the coordination of teams and meetings with the managerial processes. In order to address this gap, we developed a prototype tool, based on a Multi- Domain Matrix, for handling and tracking the performance of these elements. This paper introduces the Matrix of Interacting Groups, which evaluates the interaction of teams, meetings and managerial processes during the production control function supply. It was initially tested in a Chilean housing project and it allows the identification of team members, meetings, processes, and provides insight into the system key properties. It enables a comprehensive description of the production control function and generates a framework for tracking and for potentially fine tuning it. Although the tool is still under development, it seems promissory for providing a high level and practical regulation of production control. KW - Production Planning KW - Control KW - Complexity KW - Design Structure Matrix KW - Coordination PB - T2 - 23rd Annual Conference of the International Group for Lean Construction DA - 2015/07/29 CY - Perth, Australia L1 - http://iglc.net/Papers/Details/1167/pdf L2 - http://iglc.net/Papers/Details/1167 N1 - Export Date: 01 November 2024 DB - IGLC.net DP - IGLC LA - English ER -