TY - CONF TI - Integrating Lbms, Lps and Cpm: A Practical Process C1 - Boston, Massachusetts, USA C3 - 24th Annual Conference of the International Group for Lean Construction PY - 2016 AU - Olivieri, Hylton AU - Seppänen, Olli AU - Granja, Ariovaldo D. AD - PhD Student, Construction Management Research Laboratory (LAGERCON); Department of Architecture and Building, School of Civil Engineering, Architecture and Urban Design; University of Campinas, Brazil (UNICAMP), hylton.olivieri@gmail.com AD - Professor of Practice, Civil and Structural. Engrg. Dept., Aalto University School of Engineering, Espoo, Finland, olli.seppanen@aalto.fi AD - Associated Professor, Construction Management Research Laboratory (LAGERCON); Department of Architecture and Building, School of Civil Engineering, Architecture and Urban Design; University of Campinas, Brazil (UNICAMP), adgranja@fec.unicamp.br AB - Despite the lean construction community criticism of Critical Path Method (CPM), it is impossible to ignore its widespread use. Furthermore, CPM is commonly considered a contractual requirement demanded by owners. On the other hand, Location-Based Management System (LBMS) and Last Planner System (LPS) have been successfully implemented in many construction projects. This article puts forward the proposition that there are synergies between these tools and their combined use could provide great benefits and fill some gaps. The aim of this paper is to propose a practical process for integrating LBMS, LPS and CMP, in an attempt to improve planning and controlling processes in general, besides filling gaps related to delay analysis. A constructive research was developed through a case study, collecting data of a planning and controlling system used by a large construction company, which applies CPM and LPS tools. The processes and the main decisions of the project team were systematized in an integrated model, taking into consideration the project phases. Two additional propositions were formed to be validated in future case studies. Firstly, the integrated sources of data will help professionals to support decisions. Secondly, the schedules created with this integrated approach are better able to model workflow. KW - Location-based management KW - Last planner system KW - Critical path method KW - production KW - delays. PB - T2 - 24th Annual Conference of the International Group for Lean Construction DA - 2016/07/20 CY - Boston, Massachusetts, USA L1 - http://iglc.net/Papers/Details/1306/pdf L2 - http://iglc.net/Papers/Details/1306 N1 - Export Date: 20 April 2024 DB - IGLC.net DP - IGLC LA - English ER -