TY - CONF TI - Visual Planning for Supply Chain Management of Prefabricated Components in Construction C1 - Chennai, India C3 - 26th Annual Conference of the International Group for Lean Construction SP - 1150 EP - 1159 PY - 2018 DO - 10.24928/2018/0419 AU - Tiwari, Saurabh AU - Pawar, Girish AU - Luttmann, Eric AU - Trujillo, Rudy AU - Sreekumar, Aiswarya AD - Director, vConstruct Private Limited, Pune, India, +91- 8446001610, saurabht@vconstruct.in AD - Sr. Project Engineer, vConstruct Private Limited, Pune, India, +91- 9403976679, girishp@vconstruct.in AD - BIM Project Engineer, Digital Building Components, Phoenix, Arizona, +1- 2159138611,ericlu@digitalbuilding.com AD - Design Manager, Digital Building Components, Phoenix, Arizona,+1- 6023294255, rudyt@digitalbuilding.com AD - Sr. Project Engineer, vConstruct Private Limited, Pune, India, +91- 8826367246, aiswaryas@vconstruct.in AB - One of the challenges in the supply chain management of prefabricated components is the communication gap between the jobsite and the fabrication shop to coordinate on the deliveries. The context is the supply chain of light gauge metal stud panels that are digitally fabricated using BIM and CNC Robots in the US construction industry. The solution implemented was a cloud-based ordering application. the superintendent in the field interface with the BIM of Metal Stud Panels on an iPad, sequences the panels in the order he/she wishes to install. The order placed by the superintendent is received by the fabrication shop, which then initiates the fabrication of the panel from the same BIM, in the same sequence using the CNC robots. Once fabricated, the panels are divided into batches and transported to the site for installation. This helps in prioritizing fabrication, assembly and shipping of panels as per the needs of various jobsites. The just-in-time fabrication and delivery enables lean workflow of construction material, and minimizes waste in over-production, transportation and inventory. The paper will focus on the process in detail and benefits from this approach KW - flow KW - visual management KW - job sequencing KW - logistics KW - supply chain management PB - T2 - 26th Annual Conference of the International Group for Lean Construction DA - 2018/07/18 CY - Chennai, India L1 - http://iglc.net/Papers/Details/1510/pdf L2 - http://iglc.net/Papers/Details/1510 N1 - Export Date: 29 March 2024 DB - IGLC.net DP - IGLC LA - English ER -