TY - CONF TI - Modelling and Simulating Time Use of Site Workers With 4d BIM C1 - Chennai, India C3 - 26th Annual Conference of the International Group for Lean Construction SP - 155 EP - 165 PY - 2018 DO - 10.24928/2018/0536 AU - Vrijhoef, Ruben AU - Dijkstra, Jan Tjerk AU - Koutamanis, Alexander AD - Senior Researcher, Delft University of Technology, and Professor, Utrecht University of Applied Sciences, PO Box 5043, NL-2600 GA Delft, The Netherlands, +31639251420, r.vrijhoef@tudelft.nl AD - Master Graduate, Delft University of Technology, PO Box 5043, NL-2600 GA Delft, The Netherlands, +31639251420, J.T.Dijkstra@student.tudelft.nl AD - Associate Professor, Delft University of Technology, PO Box 5043, NL-2600 GA Delft, The Netherlands, +31639251420, A.Koutamanis@tudelft.nl AB - This paper presents a research endeavouring to model site work in a 4D BIM model. Next simulations are performed with this model in 5 scenarios including specific interventions in work organisation, notably changing positons of facilities for site workers. A case study has been done in a construction project in the Netherlands. The research has showed the possibility to model time use of site workers in 4D BIM. Next the research has showed potential to perform and calculate specific interventions in the model, and prospect realistic changes in productive time use as a result. KW - BIM KW - time use KW - simulation KW - site work KW - labour optimisation PB - T2 - 26th Annual Conference of the International Group for Lean Construction DA - 2018/07/18 CY - Chennai, India L1 - http://iglc.net/Papers/Details/1538/pdf L2 - http://iglc.net/Papers/Details/1538 N1 - Export Date: 16 April 2024 DB - IGLC.net DP - IGLC LA - English ER -