TY - CONF TI - Using Taktplanning and Taktcontrol in Production Projects – Comparsion of Construction and Equipment Phases C1 - Chennai, India C3 - 26th Annual Conference of the International Group for Lean Construction SP - 890 EP - 898 PY - 2018 DO - 10.24928/2018/0477 AU - Dlouhy, Janosch AU - Oprach, Svenja AU - Binninger, Marco AU - Richter, Tobias AU - Haghsheno, Shervin AD - Research Fellow, Karlsruhe Institute of Technology, Germany, +49-721-608-42168, janosch.dlouhy@kit.edu AD - Research Fellow, Karlsruhe Institute of Technology, Germany, +49-721-608- 44124,svenja.oprach@kit.edu AD - Research Fellow, Karlsruhe Institute of Technology, Germany, +49-721-608-44124, marco.binninger@kit.edu AD - M.Sc. Student, Karlsruhe Institute of Technology, Germany, +49-721-608-43650, info@kit.edu AD - Professor, Karlsruhe Institute of Technology, Germany, +49-721-608-42646, shervin.haghsheno@kit.edu AB - Takt Planning and Takt Control (TPTC) as a method for construction processes shows the potential for improving time aspects of construction sites in many practical examples. A first example of using the method of TPTC not only in construction but also in following processes such as equipment installation (production projects) indicates equal improvements. By analyzing 10 construction and seven equipment installation case studies, this paper gives an overview of similarities and differences in construction and equipment projects. Furthermore, it describes adjustments for using TPTC in the construction stage as well as in the equipment assembly stage and picturing each stage’s timetable in one common Takt Plan for increased clarity. Interlinking planning phases of both stages shows not only, that further time savings in implementation phases can be realized, but also that overall project planning can benefit from considering interfaces to upstream and downstream phases. KW - Lean construction KW - lean equipment KW - comparison KW - process KW - work flow. PB - T2 - 26th Annual Conference of the International Group for Lean Construction DA - 2018/07/18 CY - Chennai, India L1 - http://iglc.net/Papers/Details/1614/pdf L2 - http://iglc.net/Papers/Details/1614 N1 - Export Date: 28 March 2024 DB - IGLC.net DP - IGLC LA - English ER -