TY - CONF TI - Exploring the Relationship Among Planning Reliability (PPC), Linguistic Action Indicators and Social Network Metrics C1 - Berkeley, California, USA C3 - Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC) SP - 109 EP - 118 PY - 2020 DO - 10.24928/2020/0031 AU - Retamal, Fabián AU - Salazar, Luis A. AU - Herrera, Rodrigo F. AU - Alarcón, Luis F. AD - 1 MSc Student, Department of Construction Engineering and Management, Pontificia Universidad Católica de Chile, Researcher – GEPUC, Santiago, Chile, +56 2 2354 7165, faretamal@uc.cl, orcid.org/0000-0002-6554-5576 AD - PhD Candidate, Department of Construction Engineering and Management, Pontificia Universidad Católica de Chile, Professor, Construction Engineering, Faculty of Engineering, Universidad Andres Bello, Santiago, Chile, +56 2 2661 8346, lasalaza@uc.cl, orcid.org/0000-0001-7339-8935 AD - PhD Candidate, Department of Construction Engineering and Management, Pontificia Universidad Católica de Chile, Professor, School of Civil Engineering, Pontificia Universidad Católica de Valparaíso, Chile, +56 9 4413 2109, rodrigo.herrera@pucv.cl, orcid.org/0000-0001-5186-3154 AD - Professor, Department of Construction Engineering and Management, Pontificia Universidad Católica de Chile, Santiago, Chile, +56 2 2354 7165, lalarcon@ing.puc.cl, orcid.org/0000-0002-9277-2272 AB - Research has demonstrated the importance of information flow and workflow in the architecture, engineering and construction (AEC) industry. Through the correct application of the Last Planner® System, the coordination of a project and therefore its workflow has been improved. However, there is still a productivity gap that must be addressed through proper commitment management and good communication. Therefore, the objective of this article is to explore the relationship among planning reliability— using percentage plan completed (PPC) measures—linguistic action perspective (LAP) indicators and social network analysis (SNA) metrics in four construction projects that use the Last Planner® System in Chile and Colombia. A future line of research will be to analyze this relationship in conjunction with the main reliability indicators of construction projects through the application of PPC, LAP and SNA in more case studies KW - Linguistic Action Perspective KW - Last Planner® System KW - Social Network Analysis KW - Percentage Plan Completed KW - Case studies PB - T2 - Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC) DA - 2020/07/06 CY - Berkeley, California, USA L1 - http://iglc.net/Papers/Details/1775/pdf L2 - http://iglc.net/Papers/Details/1775 N1 - Export Date: 01 May 2024 DB - IGLC.net DP - IGLC LA - English ER -