TY - CONF TI - Lean Contributions to BIM Processes: The Case of Clash Management in Highways Design C1 - Lima, Peru C3 - Proc. 29th Annual Conference of the International Group for Lean Construction (IGLC) SP - 116 EP - 125 PY - 2021 DO - 10.24928/2021/0164 AU - Pedo, Barbara AU - Tezel, Algan AU - Koskela, Lauri AU - Whitelock-Wainwright, Andrew AU - Lenagan, Daniel AU - Nguyen, Quynh Anh AD - PhD Student and KTP Associate, School of Art, Design and Architecture, University of Huddersfield, UK, b.pedo@hud.ac.uk, orcid.org/0000-0002-6520-0981 AD - PhD Student and KTP Associate, School of Art, Design and Architecture, University of Huddersfield, UK, b.pedo@hud.ac.uk, orcid.org/0000-0002-6520-0981 AD - Professor, School of Art, Design and Architecture, University of Huddersfield, UK, l.koskela@hud.ac.uk, orcid.org/0000-0003-4449-2281 AD - Associate Technical Director, Arcadis, UK, andrew.whitelock-wainwright@arcadis.com, orcid.org/0000-0002-0517-3563 AD - Sector BIM Manager, Arcadis, UK, daniel.lenagan@arcadis.com, orcid.org/0000-0002-9960-4116 AD - PhD Student, School of Art, Design and Architecture, U AB - Managing design is still considered a challenge and few design and construction companies apply Lean and BIM in an integrated manner to support it. The interactions of Lean and BIM have been explored for more than 10 years. Despite this, most of the practical and theoretical discussions have focused on BIM capabilities' and features' contributions to Lean goals and techniques. Therefore, this paper aims to explore and discuss Lean contributions to BIM processes, which is still missing in the analysed context. Initial findings of an ongoing research project on exploring Lean and BIM synergies in the UK are presented. The investigation adopts case study as its research strategy, while exploring the potential implementation of Lean into the BIM-based clash management in highways design. The paper contributes to knowledge by determining how Lean could reduce waste and increase value of a clash detection and resolution process. The results indicate that Lean can contribute to the BIM processes, beyond the BIM capabilities and features, to support BIM process improvements. The wide range of intervention opportunities in BIM processes from a Lean perspective needs further investigation for Lean to have a firmer place in BIM discussions. KW - Lean and BIM KW - clash management KW - process KW - design management KW - waste PB - T2 - Proc. 29th Annual Conference of the International Group for Lean Construction (IGLC) DA - 2021/07/14 CY - Lima, Peru L1 - http://iglc.net/Papers/Details/1872/pdf L2 - http://iglc.net/Papers/Details/1872 N1 - Export Date: 26 April 2024 DB - IGLC.net DP - IGLC LA - English ER -