TY - CONF TI - Lean and BIM Interaction in a High Rise Building C1 - Lima, Peru C3 - Proc. 29th Annual Conference of the International Group for Lean Construction (IGLC) SP - 136 EP - 144 PY - 2021 DO - 10.24928/2021/0208 AU - Chuquín, Frank AU - Chuquín, Cristhian AU - Saire, Romina AD - Lecturer, Researcher at Construction Management & Technology Research Group (GETEC), Pontifical Catholic University of Peru, Lima, Peru, frank.chuquin@pucp.pe, orcid.org/0000-0001- 8342-6602 AD - Civil Engineer, Researcher at Construction Management & Technology Research Group (GETEC), Pontifical Catholic University of Peru, Lima, Peru, chuquin.cr@pucp.edu.pe, orcid.org/0000-0002- 4080-9600 AD - Research Assistant at Construction Management & Technology Research Group (GETEC), Pontifical Catholic University of Peru, Lima, Peru, rsairecanales@gmail.com, orcid.org/0000-0002-2433-1301 AB - Lean Design has been spreading its use in the AEC industry along with the emergence of Building Information Modelling (BIM).Those two methodologies; Lean and BIM are being implemented first independently and then together. as new means to deliver more efficient projects. This paper researches some tools of Lean and BIM that permit a positive interaction by focusing on a case study related to a high rise building for residential use. Those tools are; from Lean Construction, set based design and value stream mapping. From BIM were used a 3D model and Integrated Concurrent Engineering (ICE) sessions. Also, the paper describes the interaction between those tools in the design phase and its impact in the construction stage. KW - Lean design KW - BIM KW - set based design KW - value stream KW - ice session PB - T2 - Proc. 29th Annual Conference of the International Group for Lean Construction (IGLC) DA - 2021/07/14 CY - Lima, Peru L1 - http://iglc.net/Papers/Details/1892/pdf L2 - http://iglc.net/Papers/Details/1892 N1 - Export Date: 20 April 2024 DB - IGLC.net DP - IGLC LA - English ER -