TY - CONF TI - Method of Industrialization Potential Analysis of Construction Systems C1 - Edmonton, Canada C3 - Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC) SP - 433 EP - 444 PY - 2022 DO - 10.24928/2022/0147 AU - Vásquez-Hernández, Alejandro AU - Ortega, Jesús AU - Giménez, Zulay AU - Alarcón, Luis Fernando AD - PhD Student, Department of Construction Engineering and Management, Pontificia Universidad Católica de Chile, Santiago, Chile. Assistant Professor, School of Applied Sciences and Engineering, Universidad EAFIT, Medellín, Colombia, avasquez5@uc.cl, orcid.org/0000-0002-1073-4038 AD - 2 PhD Candidate, Department of Construction Engineering and Management, Pontificia Universidad Católica de Chile, Santiago, Chile, jaortega2@uc.cl, orcid.org/ 0000-0002-1148-937X AD - 3 Professor, School of Civil Construction, Pontificia Universidad Católica de Chile, Santiago, Chile, zmgimenez@ing.puc.cl, orcid.org/0000-0001-9051-1434 AD - 4 Professor, Department of Construction Engineering and Management, Pontificia Universidad Católica de Chile, Santiago, Chile, lalarcon@ing.puc.cl, orcid.org/0000-0002-9277-2272 AB - Construction is a production system characterized by inefficiencies associated with its processes. Industrialized construction (IC) is a promising approach as an optimization mechanism based on decreased variability. In this regard, it stimulates the standardization of work, which is an essential lean management principle to improve the production system. However, IC presents an incipient level of adoption and implementation. This paper describes a method for the industrialization potential analysis of construction systems (IPA), allowing design teams to identify construction systems whose standardization, modular coordination, and preassembly have more potential to improve project performance. It was developed through an action-oriented framework based on the action research methodology. Researchers, construction companies, and the cohesive entity of the construction sector (Industrialized Construction Council, ICC) participated. KW - Industrialized construction KW - standardization KW - modular coordination KW - preassembly PB - T2 - Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC) DA - 2022/07/27 CY - Edmonton, Canada L1 - http://iglc.net/Papers/Details/1977/pdf L2 - http://iglc.net/Papers/Details/1977 N1 - Export Date: 02 May 2024 DB - IGLC.net DP - IGLC LA - English ER -