TY - CONF TI - Systematising the creation of Line of Balance: an automated tool for multi-storey building C1 - Singapore, Singapore C3 - Proceedings of the 34th Annual Conference of the International Group for Lean Construction (IGLC 34) SP - 1654 EP - 1665 PY - 2026 DO - 10.24928/2026/0226 AU - Gonçalves, Bruna Milán AU - Corrêa, Fabiano Rogério AD - Lean Consultant at Climb Consulting Group, M.Sc., University of São Paulo (USP), São Paulo, Brazil, bruna@climbgroup.com.br, orcid.org/0009-0003-4972-5993 AD - Professor, PhD, Department of Civil Construction, University of Sao Paulo (USP), São Paulo, Brazil, fabiano.correa@usp.br, orcid.org/0000-0001-9742-3971 ED - Hamzeh, Farook ED - Poshdar, Mani ED - Garcia-Lopez,, Nelly P. AB - Planning in multi-storey buildings is often constrained by manual processes and tacit knowledge, which hinders the systematic application of Lean principles. This paper presents the formalisation of a structured method based on three deterministic spatio-temporal rules—stable rhythm, vertical continuity, and non-crossing—and its instantiation in a computational artefact developed in Excel/VBA under the Design Science Research approach. The automation reduced the processing effort of an otherwise exhaustive manual procedure to a few seconds, allowing the agile exploration of multiple rhythm scenarios. Its application to a real residential project provided a real-data environment for the artefact instantiation, supporting the identification of a schedule recovery potential of 21%, assessed significantly faster and more consistently than through conventional planning approaches. The results demonstrate that the integration between the method and its technological instantiation enhances data-driven decision-making, strengthens operational predictability, and supports the transition towards a more flow-oriented planning system. KW - Lean construction KW - location-based management KW - Line of Balance KW - scenario simulation KW - BIM. PB - T2 - Proceedings of the 34th Annual Conference of the International Group for Lean Construction (IGLC 34) DA - 2026/06/22 CY - Singapore, Singapore L1 - http://iglc.net/Papers/Details/2524/pdf L2 - http://iglc.net/Papers/Details/2524 N1 - Export Date: 19 June 2026 DB - IGLC.net DP - IGLC LA - English ER -