TY - CONF TI - Toward an industry standard for LPS maturity using a company-grounded framework C1 - Singapore, Singapore C3 - Proceedings of the 34th Annual Conference of the International Group for Lean Construction (IGLC 34) SP - 1773 EP - 1784 PY - 2026 DO - 10.24928/2026/0272 AU - Lujan, Guillermo Prado AU - Loughrin, Nick AD - Production Manager, Project Delivery Services, The Boldt Company, San Francisco, California, USA, guillermo.prado@boldt.com, orcid.org/0000-0002-5325-1132 AD - Corporate Director of Project Delivery Services, Project Delivery Services, The Boldt Company, Appleton, Wisconsin, USA, felipe.engineer@boldt.com ED - Hamzeh, Farook ED - Poshdar, Mani ED - Garcia-Lopez,, Nelly P. AB - Lean Construction maturity frameworks have been widely used to assess the implementation of Lean and the Last PlannerĀ® System (LPS); however, most approaches emphasize diagnostic evaluation of practices rather than the development of enterprise production strategy. This paper addresses this limitation by proposing an initial, practitioner-grounded outline of a company-level LPS maturity framework. The study adopts an inductive, empirically grounded approach based on the Boldt Production System (BPS) as a reference case. First, existing Lean Construction and LPS maturity frameworks are comparatively analysed to identify their primary purposes, structures, and measurement focus. Second, key omissions are identified from a company-level perspective, particularly the limited integration of estimating, production system design, execution control, and organizational learning. Third, insights from this analysis and the BPS case are synthesized into a structured set of maturity dimensions that conceptualize LPS maturity as an integrated organizational capability. The contribution is a conceptual starting point for reframing maturity beyond implementation quality toward enterprise production strategy, providing a foundation for future validation and refinement. KW - Last Planner System KW - lean construction KW - maturity framework KW - production system design. PB - T2 - Proceedings of the 34th Annual Conference of the International Group for Lean Construction (IGLC 34) DA - 2026/06/22 CY - Singapore, Singapore L1 - http://iglc.net/Papers/Details/2560/pdf L2 - http://iglc.net/Papers/Details/2560 N1 - Export Date: 19 June 2026 DB - IGLC.net DP - IGLC LA - English ER -