TY - CONF TI - Effects of Daily Management on Design Reliability C1 - Edmonton, Canada C3 - Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC) SP - 48 EP - 59 PY - 2022 DO - 10.24928/2022/0105 AU - Lappalainen, Eelon AU - Uusitalo, Petri AU - Abou-Ibrahim, Hisham AU - Seppänen, Olli AU - Hänninen, Aku AU - Söderström., Kristian AD - Doctoral Candidate, Department of Civil Engineering, Aalto University, Finland, eelon.lappalainen@aalto.fi, orcid.org/0000-0002-7573-344X AD - Postdoctoral Researcher, Department of Civil Engineering, Aalto University, Finland, petri.uusitalo@aalto.fi, orcid.org/0000-0002-5725-906X AD - Postdoctoral Researcher, Department of Civil Engineering, Aalto University, Finland, hisham.abouibrahim@aalto.fi, orcid.org/0000-0003-4261-9322 AD - Associate Professor, Department of Civil Engineering, Aalto University, Finland, olli.seppanen@aalto.fi, orcid.org/0000-0002-2008-5924 AD - Master of Science, Department of Civil Engineering, Aalto University, Finland, aku.hanninen@ideastructura.com AD - Master of Science Student, Department of Civil Engineering, Aalto University, Finland, Kristian.soderstrom@aalto.fi AB - Building Design Management (DM) is challenging due to the fragmentation of project partners, the iterative nature of design and the tradition of informal management of designers. Therefore, many contractors do not trust the promises of designers and protect the construction schedule with schedule buffers that increase project lead times. To act upon this situation, several researchers have suggested using the Last Planner™ System (LPS) as a method for DM. Using two case studies, we present how the use of the LPS method as a tool for Daily Management (DAM) increases the reliability of the design and how, correspondingly, not using it can affect design reliability. So far, very little attention has been paid to the role of DAM in DM, and this short article seeks to provide new insights into this research gap for both researchers in the field and DM professionals. These early and exploratory results, despite the limited number of cases, can be utilised in further research as well as in practical project management, especially when the reduction of schedule buffers between construction and design is targeted KW - Lean construction KW - lean design management KW - last planner KW - PPC PB - T2 - Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC) DA - 2022/07/27 CY - Edmonton, Canada L1 - http://iglc.net/Papers/Details/1944/pdf L2 - http://iglc.net/Papers/Details/1944 N1 - Export Date: 28 April 2024 DB - IGLC.net DP - IGLC LA - English ER -