@inproceedings{Koskela1996_9, author = {Koskela, Lauri and Lahdenperä, Pertti and Tanhuanpää, Veli-Pekka}, title = {Sounding the Potential of Lean Construction: A Case Study}, booktitle = {4th Annual Conference of the International Group for Lean Construction}, year = {1996}, address = {Birmingham, UK}, url = {https://www.iglc.net/papers/details/9}, abstract = {The paper gives an overview on the results of a case study, where the progress of a fast track office building project was monitored. Two main issues are considered: What were the time and cost consequences of the speeding up methods utilized? What would have been the potential of further speeding up?}, }