TY - CONF TI - Off-Site Guarding: Look-Ahead Supply Scheduling for Risk Indication With BIM AU - Zeng, Ningshuang AU - König, Markus AU - Teizer, Jochen AD - Ph.D. Candidate, Faculty of Civil and Environmental Engineering, Ruhr-University Bochum, Bochum, Germany, ningshuang.zeng@rub.de AD - Professor, Faculty of Civil and Environmental Engineering, Ruhr-University Bochum, Bochum, Germany, koenig@inf.bi.rub.de AD - Senior Lecturer and Researcher, Faculty of Civil and Environmental Engineering, Ruhr-University Bochum, Bochum, Germany, jochen.teizer@rub.de PY - 2017 DA - 2017/07/09 T2 - 25th Annual Conference of the International Group for Lean Construction C3 - 25th Annual Conference of the International Group for Lean Construction CY - Heraklion, Greece SP - 877 EP - 884 DO - 10.24928/2017/0172 SN - 2309-0979 (ISSN) AB - Modern Information and Communication Technology (ICT) make it possible to re-organize the information flow and enhance the physical flow of the Construction Supply Chain (CSC). Considering the resource status and potential risks that exist in the CSC, this paper first explores the current CSC re-organization caused by the application of Building Information Modelling (BIM) and related beneficial conditions created by ICT. It then tackles the problem of controlling risk effectively by off-site guarding the upstream of the CSC. Based on the selected approach, the concept and basic mode of a look-ahead supply schedule is proposed. Finally, results to a use case demonstrate the applica KW - Look-ahead schedule KW - CSC KW - ICT KW - BIM KW - off-site guarding. L1 - https://www.iglc.net/papers/details/1369/pdf UR - https://www.iglc.net/papers/details/1369 DB - IGLC.net LA - English N1 - Export date: 04 October 2026 ER -