TY - CONF TI - Enabling Lean Design With Management of Model Maturity AU - Nøklebye, Andreas AU - Svalestuen, Fredrik AU - Fosse, Roar AU - Lædre, Ola AD - MSc, Student, Department of Civil and Environmental Engineering, NTNU – Norwegian University of Science and Technology, 7491 Trondheim, Norway, Mobile +4745236866, asnoklebye@gmail.com AD - PhD Candidate, NTNU/Veidekke, Trondheim, Norway, +4798673172, fredrik.svalestuen@ntnu.no AD - Regional Manager, Lean Construction, Skanska, Oslo, Norway, +4793444588, roar.fosse@skanksa.no AD - Associate Professor, dr.ing., NTNU, Trondheim, Norway, +4791189938, ola.laedre@ntnu.no PY - 2018 DA - 2018/07/18 T2 - 26th Annual Conference of the International Group for Lean Construction C3 - 26th Annual Conference of the International Group for Lean Construction CY - Chennai, India SP - 79 EP - 89 DO - 10.24928/2018/0404 SN - 2309-0979 (ISSN) AB - Traditional construction management has struggled with an ad hoc approach to design, increasing the number of negative iterations and sacrificing potential value. Building Information Modelling (BIM) has been driving information management in design, but its use has yet to be described in a way which makes it compatible with planning tools such as Last Planner™. Level of Development (LOD) could allow for this by attributing maturity to the BIM-model, yet previous studies of LOD implementation have shown potential for improvement. This paper researches current approaches, experiences and requirements for using maturity-based management in design. A study of two large projects with maturity-based management using interviews and an analysis of measurements was conducted in addition to a literature scoping study. The paper formulates five aspects of BIM-based workflows which needs to be addressed in order to manage their development. In addition, the study reveals how use of maturity-based management can provide a foundation for managing BIM-based workflows according to lean principles. Finally, the paper concludes with practical recommendations for enabling lean design with management of model maturity, such as how to specify maturity levels or how to disaggregate the model into disciplinary sections. KW - Lean design KW - BIM KW - LOD KW - Set-Based Design (SBD) KW - Last Planner L1 - https://www.iglc.net/papers/details/1604/pdf UR - https://www.iglc.net/papers/details/1604 DB - IGLC.net LA - English N1 - Export date: 04 October 2026 ER -