TY - CONF TI - Applying BIM Tools in IPD Project in Peru AU - Erazo, Andrews AU - Guzman, Giankeving AU - Espinoza, Stefany AD - Graduate Student, National University of Engineering, PerĂº, aerazor@uni.edu, orcid.org/0000-0002- 5639-573X AD - Research Assistant, Virtual Design and Construction Laboratory, Department of Civil Engineering, National University of Engineering, PerĂº, gguzmang@uni.pe, orcid.org/0000-0003-3008-7867 AD - BIM Coordinator at COSAPI SA, sespinoza@cosapi.com.pe, orcid.org/0000-0002-6613-2589 PY - 2020 DA - 2020/07/06 T2 - Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC) C3 - Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC) CY - Berkeley, California, USA SP - 973 EP - 984 DO - 10.24928/2020/0108 SN - 2309-0979 (ISSN) AB - Traditional project delivery models are characterized by poor interaction in the design and construction stages, the poor process of collaboration, communication, and integration between the customer, contractor, and subcontractors. Lean Construction and Building Information Modeling have been implemented with great success in different construction projects in Peru, however, projects with IPD collaborative contracts have little information about their application in Peru. The project application is a Fast Track type project for the Pan American Lima Games 2019. The paper aims to demonstrate that the use of BIM tools enhances collaboration and integration into an IPD project. It starts with a literary review of the topics and then describes the proposed BIM and IPD integration framework, and finally evaluates the metrics obtained. KW - Integrated Project Delivery (IPD) KW - BIM KW - collaboration KW - ICE session. L1 - https://www.iglc.net/papers/details/1824/pdf UR - https://www.iglc.net/papers/details/1824 DB - IGLC.net LA - English N1 - Export date: 04 October 2026 ER -