TY - CONF TI - Application of Information Theory in Last PlannerĀ® System for Work Plan Reliability AU - Sharma, Anjali AU - Trivedi, Jyoti AD - Masters Student, M.Tech Construction Engineering and Management, CEPT University, Ahmedabad, India, +91 7874 180 260, anjali.sh1303@gmail.com, orcid.org/0000-0002-7107-3616 AD - Assistant Professor, Faculty of Technology, CEPT University, Ahmedabad , India, +91 9925 009 609, jyoti@cept.ac.in, orcid.org/0000-0001-5088-7939 PY - 2021 DA - 2021/07/14 T2 - Proc. 29th Annual Conference of the International Group for Lean Construction (IGLC) C3 - Proc. 29th Annual Conference of the International Group for Lean Construction (IGLC) CY - Lima, Peru SP - 727 EP - 735 DO - 10.24928/2021/0147 AB - Last plannerĀ® system (LPS) is an effective tool for continuous monitoring and improvement of the planning. One of the main parts of LPS is the constraint removal discussion. Identifying and removing the constraints before the execution can influence the reliability of the plan and can ultimately improve the project performance. Previous research works have indicated the use of Information theory to quantify the effect of constraint removal discussion on the performance of the weekly work plan while using Percentage Plan Complete (PPC) as an indicator of work plan reliability and considering a limited range of constraints categories. Earlier studies have proved that Task Anticipated (TA) and Task Made Ready (TMR) are better indicators of the project duration than PCC. In this paper, the researchers have used information theory to assess the effect of the constraint removal discussion on PPC, TA, and TMR of the construction projects while considering a wider range of constraints. The results signified that the important constraint categories vary for improving PPC and improving TA & TMR. Identifying and discussing the main constraint categories could improve the work plan reliability indicators up to 18%. The framework can be used repeatedly and the results can contribute to improving the effectiveness of weekly meetings in the future. KW - Last PlannerĀ® System KW - constraint analysis KW - make-ready planning KW - work plan reliability KW - information theory L1 - https://www.iglc.net/papers/details/1916/pdf UR - https://www.iglc.net/papers/details/1916 DB - IGLC.net LA - English N1 - Export date: 04 October 2026 ER -