TY - CONF TI - Proposal Model for the Management of Construction Based on Flows – a Complex Adaptive System AU - Ramírez-Valenzuela, André AU - Gamarra-Díaz, Gilberto G. AU - Erazo-Rondine, Andrews A. AD - CEO of Sonder Hub, Lima, Peru, raramirezv@uni.pe, orcid.org/0000-0003-4585-9946 AD - Civil Engineering, Faculty of Civil Engineering, Universidad Nacional de Ingeniería,, Lima, Peru, gilberto.gamarra.d@uni.pe, orcid.org/0000-0002-1469-7342 AD - Teaching Assistant, Faculty of Civil Engineering, Universidad Nacional de Ingeniería,, Lima, Peru aerazor@uni.edu, orcid.org/0000-0002-5639-573X PY - 2021 DA - 2021/07/14 T2 - Proc. 29th Annual Conference of the International Group for Lean Construction (IGLC) C3 - Proc. 29th Annual Conference of the International Group for Lean Construction (IGLC) CY - Lima, Peru SP - 859 EP - 869 DO - 10.24928/2021/0205 AB - Project management models understand construction as an ordered and simple phenomenon without considering its complexity, dynamism, and high variability. Also, they are models adapted from other sectors such as manufacturing and information technology (IT). This research aims to be a new trend for developing management models, typical of construction, from complexity. The following points are considered, as a first step, to this new trend of holistic construction management: 1. Generate and manage flows, which are the main components for the production in construction—beginning to understand each flow, its importance, and its properties; and 2. Manage complexity in construction projects by understanding and promoting the production system as a Complex Adaptive System (CAS) that requires organizations of action and learning as an Operational Excellence Organization. The proposed model offers a holistic analysis of the system considering flow management as a basis. It relates the project management approaches proposed by Bertelsen and Koskela (2005), the Value – Flow – Operation (VFO) model proposed by Bertelsen (2017), and the seven preconditions of Koskela (2000), except for external conditions by which these are a threat of flow, but do not flow in the proposed model. KW - Complexity KW - flow integration KW - value KW - management KW - complex adaptive system (CAS). L1 - https://www.iglc.net/papers/details/1936/pdf UR - https://www.iglc.net/papers/details/1936 DB - IGLC.net LA - English N1 - Export date: 04 October 2026 ER -