TY - CONF TI - Investigating and Simulating Collaboration Among the LPS Phases AU - Pourrahimian, Elyar AU - Shehab, Lynn AU - Hamzeh, Farook AD - Ph.D. Candidate, Hole School of Construction Engineering, University of Alberta, Edmonton, Canada, elyar@ualberta.ca, orcid.org/0000-0003-0035-2324 AD - Ph.D. Student, Hole School of Construction Engineering, University of Alberta, Edmonton, Canada, lshehab@ualberta.ca, orcid.org/0000-0002-2708-3550 AD - Associate Professor, Hole School of Construction Engineering, University of Alberta, Edmonton, Canada, hamzeh@ualberta.ca, orcid.org/0000-0002-3986-9534 PY - 2023 DA - 2023/06/26 T2 - Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31) C3 - Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31) CY - Lille, France SP - 929 EP - 941 DO - 10.24928/2023/0174 SN - 2789-0015 (ISSN) AB - Although heavily studied, collaboration in construction is still perceived as an elusive or intangible aspect because of its complex nature. Its complexity roots in the unfeasibility of quantifying it or its impacts on the performance of a construction project. While some studies acknowledged the need to evaluate or assess collaboration, empirical and numerical methods that pertain to direct quantification of either collaboration or the impacts of collaboration on the performance of a project are still unaddressed. This paper aims to address this gap from a Lean perspective by investigating the effects of collaboration throughout the different phases of the Last Planner System. After a thorough analysis of the collaborative points occurring in each phase, computer simulation is employed to model the progression of a construction project from pull planning to lookahead planning and finally to execution while also modelling collaboration among the project members. Findings on how collaboration during each phase impacts the project performance differently are presented. This study's contribution lies in highlighting the importance of early collaboration in construction projects and emphasizing the need for accurate quantification of such qualitative aspects. KW - Collaboration KW - Last PlannerĀ® System KW - agent-based modelling KW - and simulation. L1 - https://www.iglc.net/papers/details/2112/pdf UR - https://www.iglc.net/papers/details/2112 DB - IGLC.net LA - English N1 - Export date: 04 October 2026 ER -