TY - CONF TI - A VDC Framework Proposal for Time Optimization in Diamond Drilling Operations for Mining AU - Araujo, Luis Alonso Salazar AU - Bernales, Michele Trefogli Voto AU - Savio, Alexandre Almeida Del AD - Student, Civil Engineering Department, Universidad de Lima, Lima, Peru, 20171401@aloe.ulima.edu.pe, https://orcid.org/0000-0002-0795-3854 AD - Student, Civil Engineering Department, Universidad de Lima, Lima, Peru, 20171566@aloe.ulima.edu.pe, https://orcid.org/0009-0009-4186-3869 AD - Full Professor, Civil Engineering Department, Universidad de Lima, Lima, Peru, delsavio@gmail.com, https://orcid.org/0000-0002-6067-6606 PY - 2023 DA - 2023/06/26 T2 - Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31) C3 - Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31) CY - Lille, France SP - 1582 EP - 1592 DO - 10.24928/2023/0233 SN - 2789-0015 (ISSN) AB - A Virtual Design and Construction (VDC) framework proposal is presented for time optimization in diamond drilling operations for a mining exploration project. The mining project is located in the Huancavelica region of Peru and is currently in the underground exploration phase through diamond drilling drillholes. The geology team uses diamond drilling samples to estimate the total mineral reserves of the mine, and they have projected 13,278 meters to be drilled. The VDC framework proposal’s application allowed a better understanding of diamond drilling processes to support the variability source reduction related to equipment, maintenance and operational tasks. The results showed a time optimization in the diamond drilling operation of 10%. KW - VDC KW - diamond drilling KW - mining explorations KW - project management KW - process optimization. L1 - https://www.iglc.net/papers/details/2165/pdf UR - https://www.iglc.net/papers/details/2165 DB - IGLC.net LA - English N1 - Export date: 04 October 2026 ER -