TY - CONF TI - Metrics in Integrated Concurrent Engineering (ICE): Insights, Challenges, and Opportunities AU - Bøen, Sivert Risnes AU - Drevland, Frode AD - M.Sc. Graduate, Norwegian University of Science and Technology (NTNU), Trondheim, Norway, sivert.boen@me.com AD - Associate Professor, Norwegian University of Science and Technology (NTNU), Trondheim, Norway, frode.drevland@ntnu.no, orcid.org/0000-0002-4596-1564 ED - Seppänen, Olli ED - Koskela, Lauri ED - Murata, Koichi PY - 2025 DA - 2025/06/02 T2 - Proceedings of the 33rd Annual Conference of the International Group for Lean Construction (IGLC 33) C3 - Proceedings of the 33rd Annual Conference of the International Group for Lean Construction (IGLC 33) CY - Osaka and Kyoto, Japan SP - 270 EP - 281 DO - 10.24928/2025/0250 SN - 2789-0015 (ISSN) AB - The Norwegian construction industry has experienced a 10% productivity decline since 2000, in stark contrast to a 30% increase in the Norwegian private sector. To address this issue, Virtual Design and Construction (VDC)—including Integrated Concurrent Engineering (ICE)—has gained prominence. Although metrics are central to ICE sessions for guiding decision-making and fostering continuous improvement, their practical usage often falls short of theoretical ideals. This paper investigates current measurement practices, the challenges they pose, and strategies for more effective implementation. A qualitative study involving semi-structured interviews with eight industry experts was conducted, and data were analysed using thematic coding. Findings indicate that while practitioners value metrics—particularly meeting evaluation surveys, PPC (Percent Plan Complete), and BIM-focused indicators—their deployment is hindered by participant selection problems, underutilized data, and technological incompatibilities. The study proposes a multi-pronged approach for improvement: automation of data collection, standardization of measurement protocols, fostering an open data-sharing culture, and continuous review of metric relevance. These recommendations aim to bridge the gap between theoretical metrics frameworks and day-to-day industry practices, ultimately enhancing productivity and project outcomes. KW - Virtual Design and Construction (VDC) KW - Integrated Concurrent Engineering (ICE) KW - Metrics KW - Continuous Improvement KW - Lean Construction L1 - https://www.iglc.net/papers/details/2404/pdf UR - https://www.iglc.net/papers/details/2404 DB - IGLC.net LA - English N1 - Export date: 04 October 2026 ER -