TY - CONF TI - Introduction of a Digital Earthwork Construction Site AU - Kirchbach, Kim AU - Steuer, Dominik AU - Gehbauer, Fritz AD - Research Fellow. Karlsruhe Institute of Technology (KIT), Institute for Technology and Management in Construction, Am Fasanengarten, Geb. 50.31, 76131 Karlsruhe, Germany, Phone +49 721 60848223, kim.kirchbach@kit.edu AD - Graduate Student. Karlsruhe Institute of Technology (KIT), Institute for Technology and Management in Construction, Am Fasanengarten, Geb. 50.31, 76131 Karlsruhe, Germany, dominik.steuer@student.kit.edu AD - Professor. Karlsruhe Institute of Technology (KIT), Institute for Technology and Management in Construction, Am Fasanengarten, Geb. 50.31, 76131 Karlsruhe, Germany, Phone +49 721 60842646, fritz.gehbauer@kit.edu ED - Formoso, Carlos Torres ED - Tzortzopoulos, Patricia PY - 2013 DA - 2013/07/31 T2 - 21th Annual Conference of the International Group for Lean Construction C3 - 21th Annual Conference of the International Group for Lean Construction CY - Fortaleza, Brazil SP - 791 EP - 800 SN - 2309-0979 (ISSN) AB - The concept of the “digital factory” has already been successfully implemented in the automotive and manufacturing industry. An adaption, following lean principles, to the construction site seems promising. Combining sensors, information technology, and approaches of Building information modeling (BIM) allows a cross-linking of construction machines and therefore offers a higher level of information transparency. This enables construction machines a faster way of discovering changes through the dynamics of the construction process (change of soil class, weather conditions, etc.). Higher transparency and reduced waste can lead not only to a higher utilization of one construction machine but also to a higher efficiency of the whole process chain by the related lean management methods. The collected information can also be used for a new and dynamic type of allocation of the construction machines based on a flexible Kanban system. An improved constructive cooperation and coordination (e.g. reduced waiting or unproductive times) ensures that potentials will be exploited and a value maximization achieved. This paper will show a theoretical model, based on expert interviews and stochastic simulations. It provides an estimation of the implementation cost and running expenses in comparison with the mentioned potential for optimization KW - Lean Construction KW - IT in Lean KW - standardization KW - visual management KW - Last Planner System L1 - https://www.iglc.net/papers/details/918/pdf UR - https://www.iglc.net/papers/details/918 DB - IGLC.net LA - English N1 - Export date: 04 October 2026 ER -