https://doi.org/10.24928/2026/0293

Generation and characterization of Takt Planning strategies in precast-slab basements

Yaser Miranda1, Saul Ortiz2, Walter Meléndez3 & José Salgado4

1Student of Civil Engineering, Universidad Nacional de Ingeniería, Perú, [email protected], orcid.org/0000-0009-4278-5043
2Consultant, Konectaplanner Consultores, Perú, [email protected], orcid.org/0009-0003-7485-4746
3Professor, Universidad Continental, Perú, [email protected], orcid.org/0009-0002-4007-3688
4Professor, Faculty of Civil Engineering, Universidad Nacional de Ingeniería, Perú, [email protected], orcid.org/0000-0002-5298-0704

Abstract

Selecting a Takt Planning strategy for basement construction with precast slabs is a production system design problem, since different combinations of sectorization and takt time lead to different tradeoffs in duration, variable cost, and implementation demands. Existing Takt Planning research provides limited support for systematically generating comparable alternatives and justifying strategy selection for a specific project context. This paper proposes a framework to generate, compare, and select Takt Planning strategies and applies it to six basement levels of a multifamily building in Lima, Peru. The alternatives are defined by combining sectorization and takt time and are assessed through project duration, variable cost, and implementation demands related to structural capacity, supervision, material logistics, labor, and cash flow. Results show that shorter duration alone is not a sufficient basis for selection, because alternatives with similar time and cost performance can impose substantially different implementation demands. In the case studied, the alternative with five sectors and a one day takt provided the best balance between economic performance and implementation feasibility. The paper contributes a structured procedure to support early Takt Planning decisions under real project constraints. Future research should test the framework in other project types and refine the assessment of implementation demands.

Keywords

Takt Planning, lean construction, basement construction, implementation demands.

Files

Reference

Download: BibTeX | RIS Format

Reference in APA 7th edition format:

Miranda, Y., Ortiz, S., Meléndez, W. & Salgado, J.. (2026). Generation and characterization of Takt Planning strategies in precast-slab basements. In Hamzeh, F., Poshdar, M., & Garcia-Lopez,, N. P. (Eds.), Proceedings of the 34th Annual Conference of the International Group for Lean Construction (IGLC 34) (pp. 1810–1821). https://doi.org/10.24928/2026/0293

Shortened reference for use in IGLC papers:

Miranda, Y., Ortiz, S., Meléndez, W. & Salgado, J.. (2026). Generation and characterization of Takt Planning strategies in precast-slab basements. IGLC34. https://doi.org/10.24928/2026/0293