Authors

Hasse H. Neve

8 papers at 3 conferences, 2019–2022.

ORCID 0000-0003-2311-3529

Also published as Hasse Neve.

  1. 2022
    Identifying the Impact on Labor Productivity From Design Choices Through Work Sampling
    Jon Lerche, Søren Wandahl and Hasse Neve · IGLC 30, 2022 · PDF
  2. 2021
    What a Waste of Time
    Søren Wandahl, Hasse H. Neve and Jon Lerche · IGLC 29, 2021 · PDF · Slides
  3. 2021
    Combining Lean Methods to Improve Construction Labour Efficiency in Renovation Projects
    Hasse H. Neve, Jon Lerche and Søren Wandahl · IGLC 29, 2021 · PDF · Slides
  4. 2021
    A Model to Link Takt Schedules and Operations in Construction
    Jon Lerche, Hasse Neve, Allan Gross and Søren Wandahl · IGLC 29, 2021 · PDF · Slides
  5. 2021
    Lean Renovation – a Case Study of Productivity, Flow, and Time Improvements
    Peder Johansen, Søren Christensen, Hasse H. Neve and Søren Wandahl · IGLC 29, 2021 · PDF · Slides
  6. 2019
    Lessons for Construction: Delivering Mega Project on Time Through Culture and Hoshin Kanri
    Søren Leth, Jon Lerche, Hasse H. Neve and Søren Wandahl · IGLC 27, 2019 · PDF · Slides
  7. 2019
    Why Would Location-Based Scheduling Be Applicable for Offshore Wind Turbine Construction?
    Jon Lerche, Olli Seppänen, Kristian Birch Pedersen, Hasse Neve, Søren Wandahl and Allan Gross · IGLC 27, 2019 · PDF · Slides
  8. 2019
    Why Would Location-Based Scheduling Be Applicable for Offshore Oil and Gas Construction?
    Jon Lerche, Hasse Neve, Kristian Birch Pedersen, Søren Wandahl and Allan Gross · IGLC 27, 2019 · PDF · Slides