2026
Safety risk factors associated with a lean wood-framing prefabrication facility: a case studyVishal Sharma, Don Mah, Neetu Sharma, Mohamed Al-Hussein, Ahmed Bouferguene and Haitao Yu · IGLC 34, 2026 · PDF
-
2025
Impacts of Prefabrication on Construction Workers’ Wellbeing: a Case StudyVishal Sharma, Don Mah, Neetu Sharma, Mohamed Al-Hussein, Ahmed Bouferguene and Haitao Yu · IGLC 33, 2025 · PDF
-
2023
Factors Influencing Cycle Times in Offsite ConstructionFatima Alsakka, Haitao Yu, Farook Hamzeh and Mohamed Al-Hussein · IGLC 31, 2023 · PDF
-
2023
Application of Fuzzy Logic for Selection of Off-Site Construction ApproachAmirhossein Mehdipoor, Ivanka Iordanova and Mohamed Al-Hussein · IGLC 31, 2023 · PDF
-
2022
Hybrid Lean Decision-Making Framework Integrating Value Stream Mapping and Simulation: A Manufacturing Case StudyOmar Abdel-Jaber, Anas Itani and Mohamed Al-Hussein · IGLC 30, 2022 · PDF
-
2022
The Impacts of Lean Implementation Revealed in the Course of Building a Digital Twin of a Construction Manufacturing FacilityFatima Alsakka, Mohammad Darwish, Haitao Yu, Farook Hamzeh and Mohamed Al-Hussein · IGLC 30, 2022 · PDF
- 2020
-
2019
Predicting Performance Indicators Using BIM and Simulation for a Wall Assembly LineRyan Brown, Beda Barkokebas, Chelsea Ritter and Mohamed Al-Hussein · IGLC 27, 2019 · PDF
-
2017
Simulation of Production Line Improvement in Modular Home ManufacturingChelsea Ritter, Youyi Zhang, Roger Dupuis and Mohamed Al-Hussein · IGLC 25, 2017 · PDF
-
2014
An Enhanced Scheduling Technique for Modular Construction ManufacturingMana Moghadam and Mohamed Al-Hussein · IGLC 22, 2014 · PDF
-
2013
Resource Optimization for Modular Construction Through Value Stream Map ImprovementMana Moghadam and Mohamed Al-Hussein · IGLC 21, 2013 · PDF
-
2007
Managing Variability In-House ProductionHaitao Yu, Tarry Tweed, Mohamed Al-Hussein and Reza Nasseri · IGLC 15, 2007 · PDF