Antti Peltokorpi

35 papers at 11 conferences, 2016–2026.

ORCID 0000-0002-7939-6612

  1. 2026
    Catalysts for learning and innovation in Takt production
    Eelon Lappalainen, Antti Peltokorpi and Olli Seppänen · IGLC 34, 2026 · PDF
  2. 2026
    Digital material flow management in Takt production
    Jaakko Riekki, Olli Seppänen and Antti Peltokorpi · IGLC 34, 2026 · PDF
  3. 2025
    Building the Capabilities for Takt Production Performance Measurement
    Jaakko Riekki, Joonas Lehtovaara, Olli Seppänen and Antti Peltokorpi · IGLC 33, 2025 · PDF
  4. 2025
    Learning From the Best: Lessons to Construction From High-performing Teams Across Sectors
    Joonas Lehtovaara, Antti Peltokorpi and Olli Seppänen · IGLC 33, 2025 · PDF
  5. 2024
    Quantitative Indicators in Takt Production Control: An Empirical Analysis
    Jaakko Riekki, Olli Seppänen, Joonas Lehtovaara and Antti Peltokorpi · IGLC 32, 2024 · PDF
  6. 2024
    Implementing Digital Visual Management: A Case Study on Challenges and Barriers
    Ana Reinbold, Eelon Lappalainen, Petri Uusitalo, Olli Seppänen and Antti Peltokorpi · IGLC 32, 2024 · PDF
  7. 2023
    Analysing Film Plastic Waste in Residential Construction Project
    Krishna Chauhan, Antti Peltokorpi and Olli Seppänen · IGLC 31, 2023 · PDF
  8. 2023
    Achieving a 4-Hour Takt Time – and Driving Change With It
    Jaakko Riekki, Jukka Rannisto, Joonas Lehtovaara, Olli Seppänen and Antti Peltokorpi · IGLC 31, 2023 · PDF
  9. 2022
    Continuous Improvement of Takt Production With Data-Driven Knowledge Management Approach
    Toni Ahonen, Joonas Lehtovaara, Antti Peltokorpi and Petri Uusitalo · IGLC 30, 2022 · PDF
  10. 2022
    Managing Product Information for Lean Construction: Use Cases and a Proposed Process
    Antti Peltokorpi and Olli Seppänen · IGLC 30, 2022 · PDF
  11. 2022
    Mechanical, Electrical and Plumbing Coordination Practices: Case Finnish Construction Market
    Krishna Chauhan, Antti Peltokorpi, Hisham Abou-Ibrahim and Olli Seppänen · IGLC 30, 2022 · PDF
  12. 2021
    Improving Street Reconstruction Projects in City Centers Through Collaborative Practices
    Olli Seppänen, Rita Lavikka, Joonas Lehtovaara and Antti Peltokorpi · IGLC 29, 2021 · PDF · Slides
  13. 2021
    Developing a Framework for Systemic Transformation of the Construction Industry
    Antti Peltokorpi, Olli Seppänen, Joonas Lehtovaara, Ergo Pikas and Otto Alhava · IGLC 29, 2021 · PDF · Slides
  14. 2021
    Design Process Stability: Observations of Batch Size, Throughput Time and Reliability in Design
    Eelon Lappalainen, Petteri Uusitalo, Olli Seppänen and Antti Peltokorpi · IGLC 29, 2021 · PDF · Slides
  15. 2021
    Enhancing Internal Vertical Logistics Flows in High-Rise Construction: An Exploratory Study
    Alaa Al Barazi, Olli Seppanen, Ergo Pikas, Joonas Lehtovaara and Antti Peltokorpi · IGLC 29, 2021 · PDF · Slides
  16. 2021
    Takt Production as Operations Strategy: Client’s Perspective to Value-Creation and Flow
    Joonas Lehtovaara, Aleksi Heinonen, Miika Ronkainen, Olli Seppänen and Antti Peltokorpi · IGLC 29, 2021 · PDF · Slides
  17. 2021
    Challenges in Industrialized Renovation of Apartment Buildings
    Ergo Pikas, Olli Seppänen, Lauri Koskela and Antti Peltokorpi · IGLC 29, 2021 · PDF · Slides
  18. 2020
    Waste in Design Management Operations From the Viewpoint of Project Needs
    Petteri Uusitalo, Joonas Lehtovaara, Olli Seppänen and Antti Peltokorpi · IGLC 28, 2020 · PDF · Slides
  19. 2020
    Takt Maturity Model: From Individual Successes Towards Systemic Change in Finland
    Joonas Lehtovaara, Aleksi Heinonen, Rita Lavikka, Miika Ronkainen, Pekka Kujansuu, Anton Ruohomäki, Maiju Örmä, Olli Seppänen and Antti Peltokorpi · IGLC 28, 2020 · PDF · Slides
  20. 2020
    How Does Takt Production Contribute to Trade Flow in Construction?
    Pekka Kujansuu, Joonas Lehtovaara, Saara Salerto, Olli Seppänen and Antti Peltokorpi · IGLC 28, 2020 · PDF · Slides
  21. 2020
  22. 2020
    The Role of Digitalized Visual Management to Empower Selfmanaged Crews in Construction Projects
    Ana Reinbold, Olli Seppänen and Antti Peltokorpi · IGLC 28, 2020 · PDF · Slides
  23. 2020
    Construction Workers’ Situational Awareness – An Overlooked Perspective
    Christopher Görsch, Olli Seppänen, Antti Peltokorpi and Rita Lavikka · IGLC 28, 2020 · PDF · Slides
  24. 2019
  25. 2019
    Combining Takt Production With Industrialized Logistics in Construction
    Müge Tetik, Antti Peltokorpi, Olli Seppänen, Ari Viitanen and Joonas Lehtovaara · IGLC 27, 2019 · PDF · Slides
  26. 2019
    Implementing Takt Planning and Takt Control Into Residential Construction
    Joonas Lehtovaara, Iina Mustonen, Petteri Peuronen, Olli Seppänen and Antti Peltokorpi · IGLC 27, 2019 · PDF · Slides
  27. 2019
    Deciding Between Prefabrication and On-Site Construction: A Choosing-by-Advantage Approach
    Krishna Chauhan, Antti Peltokorpi, Rita Lavikka and Olli Seppänen · IGLC 27, 2019 · PDF · Slides
  28. 2019
    Integrating Indoor Positioning Systems and BIM to Improve Situational Awareness
    Ana Reinbold, Olli Seppänen, Antti Peltokorpi, Vishal Singh and Erez Dror · IGLC 27, 2019 · PDF · Slides
  29. 2019
    Comparison of Collaboration and Trade Partner Commitment in Takt Implementation Cases
    Pekka Kujansuu, Joonas Lehtovaara, Max Grönvall, Olli Seppänen and Antti Peltokorpi · IGLC 27, 2019 · PDF · Slides
  30. 2018
    Combining Takt Planning With Prefabrication for Industrialized Construction
    Krishna Chauhan, Antti Peltokorpi, Olli Seppänen and Klas Berghede · IGLC 26, 2018 · PDF
  31. 2017
    Platform Ecosystems: Unlocking the Subcontractors’ Business Model Opportunities
    Enni Laine, Otto Alhava, Antti Peltokorpi and Olli Seppänen · IGLC 25, 2017 · PDF
  32. 2017
    Review of Lean Design Management: Processes, Methods and Technologies
    Petteri Uusitalo, Hylton Olivieri, Olli Seppänen, Ergo Pikas and Antti Peltokorpi · IGLC 25, 2017 · PDF
  33. 2017
    Real-Time Tracking of Production Control: Requirements and Solutions
    Hylton Olivieri, Olli Seppänen and Antti Peltokorpi · IGLC 25, 2017 · PDF
  34. 2016
  35. 2016
    Project Lifecycle Approach to the Perceived Value of Suppliers: A Study of a Finnish Contractor
    Antti Peltokorpi, Olli Seppänen and Abdollah Noorizadeh · IGLC 24, 2016 · PDF