IGLC 24 · Boston, Massachusetts, USA · 2016

Experiences From the Use of BIM-Stations

  1. M.Sc., Dept. of Civil and Transport Engineering, Norwegian University of Science and Technology (NTNU), Trondheim, Norway, +47 918 13 994, vegarmu@stud.ntnu.no
  2. M.Sc., Dept. of Civil and Transport Engineering, Norwegian University of Science and Technology (NTNU), Trondheim, Norway, +47 928 41 916, aleksave@stud.ntnu.no
  3. Ph.D. Candidate, Dept. of Civil and Transport Engineering, Norwegian University of Science and Technology (NTNU)/Veidekke Entreprenør AS, Norway, +47 986 73 172, fredrik.svalestuen@ntnu.no
  4. Research scientist, dr. art., Department of Civil and Transport Engineering, Norwegian University of Science and Technology (NTNU), Trondheim, Norway
  5. Associate Professor, Dept. of Civil and Transport Engineering, NTNU Norwegian University of Science and Technology, Trondheim, Norway, +47 911 89 938, ola.ladre@ntnu.no

Abstract

BIM has gone from being a design-tool to being an important part of the production process. BIM-stations make 3D-models available for everyone, including all the workers on-site. This paper 1) reports on experiences from the use of BIM-stations on site and 2) suggests certain improvements to increase the benefit of the BIM-stations. Following a case study approach, it examines the production phase of a building project in Norway. Initially, a survey among 50 workers on-site was carried out. Both carpenters, plumbers and electricians conducted the survey. This was followed by semi-structured in-depth interviews with six key actors. Among the interviewees was the project manager, the BIM-coordinator on the project, and managers from the project owner’s organization. The research revealed that workers experience saving time with BIM-stations. They report higher productivity due to having the necessary information available at all time. The highest productivity increase appeared for the MEP workers. This study was carried out over a relatively short period, with limited access to measurements of cost and savings from the use of BIM-stations. Nonetheless, the findings are still very positive and can guide future implementation of BIM-stations in the production phase.

Keywords

  • Building information modelling
  • BIM on site
  • BIM-stations
  • visualization
  • on-site communication

Cite this paper

APA 7th edition

Murvold, V., Vestermo, A., Svalestuen, F., Lohne, J., & Lædre, O. (2016). Experiences From the Use of BIM-Stations. In 24th Annual Conference of the International Group for Lean Construction.

Shortened reference for IGLC papers

Murvold, V., Vestermo, A., Svalestuen, F., Lohne, J., & Lædre, O. (2016). Experiences From the Use of BIM-Stations. IGLC24.