Sounding the Potential of Lean Construction: A Case Study

Lauri Koskela1, Pertti Lahdenperä2 & Veli-Pekka Tanhuanpää3

1VTT Building Technology, P.O. Box 1801, FI-02044 VTT, Finland
2VTT Building Technology, P.O. Box 1801, FI-02044 VTT, Finland
3VTT Building Technology, P.O. Box 1801, FI-02044 VTT, Finland

Abstract

The paper gives an overview on the results of a case study, where the progress of a fast track office building project was monitored. Two main issues are considered: What were the time and cost consequences of the speeding up methods utilized? What would have been the potential of further speeding up?

Keywords

Files

Reference

Download: BibTeX | RIS Format

Reference in APA 7th edition format:

Koskela, L., Lahdenperä, P. & Tanhuanpää, V.. (1996). Sounding the Potential of Lean Construction: A Case Study. 4th Annual Conference of the International Group for Lean Construction.

Shortened reference for use in IGLC papers:

Koskela, L., Lahdenperä, P. & Tanhuanpää, V.. (1996). Sounding the Potential of Lean Construction: A Case Study. IGLC4.