Authors

Hisham Abou-Ibrahim

9 papers at 5 conferences, 2015–2025.

ORCID 0000-0003-4261-9322

Also published as Hisham Abou Ibrahim, Hisham A. Abou Ibrahim, Hisham Abou Ibrahim.

  1. 2025
    Daily Batch Size of Design – Proposal for the Sizing of Design Batches
    Eelon Lappalainen, Hisham Abou-Ibrahim, Jyrki Oraskari, Olli Seppänen, Umer Majid and Markus Derry · IGLC 33, 2025 · PDF
  2. 2022
    Effects of Daily Management on Design Reliability
    Eelon Lappalainen, Petri Uusitalo, Hisham Abou-Ibrahim, Olli Seppänen, Aku Hänninen and Kristian Söderström. · IGLC 30, 2022 · PDF
  3. 2022
    Findings on the Use of the Last Planner System—a Case Study
    Eelon Lappalainen, Hisham Abou Ibrahim, Olli Seppänen and Ilari Palsola · IGLC 30, 2022 · PDF
  4. 2022
    Uncovering and Visualizing Work Process Interruptions Through Quantitative Workflow Analysis
    Christopher Görsch, Alaa Al Barazi, Olli Seppänen and Hisham Abou Ibrahim · IGLC 30, 2022 · PDF
  5. 2022
    Mechanical, Electrical and Plumbing Coordination Practices: Case Finnish Construction Market
    Krishna Chauhan, Antti Peltokorpi, Hisham Abou-Ibrahim and Olli Seppänen · IGLC 30, 2022 · PDF
  6. 2022
    Digital Twin of a Design Process: An Exploratory Study
    Hisham Abou-Ibrahim, Eelon Lappalainen and Olli Seppänen · IGLC 30, 2022 · PDF
  7. 2017
    Design Management: Metrics and Visual Tools
    Hisham Abou-Ibrahim and Farook Hamzeh · IGLC 25, 2017 · PDF
  8. 2016
    BIM: A TFV Perspective to Manage Design Using the LOD Concept
    Hisham Abou-Ibrahim and Farook Hamzeh · IGLC 24, 2016 · PDF
  9. 2015
    Expected Lean Effects of Advanced High-Rise Formwork Systems
    Hisham A. Abou Ibrahim and Farook R. Hamzeh · IGLC 23, 2015 · PDF