Authors

Bo Terje Kalsaas

32 papers at 15 conferences, 2009–2025.

ORCID 0000-0003-4383-1683

Also published as Bo Terje Kalsaas.

  1. 2025
    What Types of Problem-Solving are Used in the Last Planner System?
    Trond Bølviken, John Skaar, Bo Terje Kalsaas and Lauri Koskela · IGLC 33, 2025 · PDF
  2. 2025
    Revitalizing Language Action in the Last Planner System™
    John Skaar, Trond Bølviken and Bo Terje Kalsaas · IGLC 33, 2025 · PDF
  3. 2023
    What Does a Commitment to a Plan Mean?
    John Skaar, Trond Bølviken, Bo Terje Kalsaas and Lauri Koskela · IGLC 31, 2023 · PDF
  4. 2022
    The Dual Nature of Complexity in Construction Management–Call for a Renewed Debate
    Bo Terje Kalsaas, Trond Bølviken and John Skaar · IGLC 30, 2022 · PDF
  5. 2021
    The Impact of BVP in a TVD Based Project Delivery
    Tobias O. Malvik, Bo Terje Kalsaas, Rouzbeh Shabani and Karl Oscar Sandvik · IGLC 29, 2021 · PDF · Slides
  6. 2021
    Brought by Degrees: A Focus on the Current Indicators of Lean ‘Smartness’ in Smart Cities
    Dave Collins, Agnar Johansen, Bo Terje Kalsaas, Alenka Temeljotov-Salaj and Mohammed Hamdy · IGLC 29, 2021 · PDF · Slides
  7. 2021
    The Importance of Alignment
    John Skaar and Bo Terje Kalsaas · IGLC 29, 2021 · PDF · Slides
  8. 2020
    Principles as a Bridge Between Theory and Practice
    John Skaar, Trond Bølviken, Lauri Koskela and Bo Terje Kalsaas · IGLC 28, 2020 · PDF · Slides
  9. 2020
    Comparing Road Construction Projects Against an IPD Standard
    Tobias O. Malvik, Atle Engebø, Paulos A. Wondimu, Agnar Johansen and Bo Terje Kalsaas · IGLC 28, 2020 · PDF · Slides
  10. 2018
    Transformation From Design-Bid-Build to Design-Build Contracts in Road Construction
    Bo Terje Kalsaas, Gøril Hannås, Grethe Frislie and John Skaar · IGLC 26, 2018 · PDF
  11. 2018
    New Approach to Developing Integrated Milestones for Planning and Production Control
    Bo Terje Kalsaas and Kai Haakon Kristensen · IGLC 26, 2018 · PDF
  12. 2017
    A Balanced Dashboard for Production Planning and Control.
    Trond Bølviken, Sigmund Aslesen, Bo Terje Kalsaas and Lauri Koskela · IGLC 25, 2017 · PDF
  13. 2016
    Towards a Model for Planning and Controlling ETO Design Projects
    Bo Terje Kalsaas, Knut E. Bonnier and Arne O. Ose · IGLC 24, 2016 · PDF
  14. 2015
    Pull vs. Push in Construction Work Informed by Last Planner
    Bo Terje Kalsaas, John Skaar and Rein Terje Thorstensen · IGLC 23, 2015 · PDF
  15. 2015
    Waste in Design and Engineering
    Knut Erik Bonnier, Bo Terje Kalsaas and Arne Olai Ose · IGLC 23, 2015 · PDF
  16. 2014
    Increase Predictability in Complex Engineering and Fabrication Projects
    Knut Anders Lia, Henning Ringerike and Bo Terje Kalsaas · IGLC 22, 2014 · PDF
  17. 2014
    To Achieve Predictability in Engineering
    Bo Terje Kalsaas, Stian Finsådal and Kristian Hasle · IGLC 22, 2014 · PDF
  18. 2014
    Integrated Planning vs. Last Planner System
    Bo Terje Kalsaas, Ingvald Grindheim and Nina Læknes · IGLC 22, 2014 · PDF
  19. 2014
    Construction Site Operations Made Leaner and Standardized: A Case Study
    Roar Fosse, Bo Terje Kalsaas and Frode Drevland · IGLC 22, 2014 · PDF
  20. 2014
    To Measure Workflow and Waste. A Concept for Continuous Improvement
    Bo Terje Kalsaas, Mariann Gundersen and Truls Olav Berge · IGLC 22, 2014 · PDF
  21. 2013
    Measuring Waste and Workflow in Construction
    Bo Terje Kalsaas · IGLC 21, 2013 · PDF
  22. 2013
    Improving Buildabuility With Platforms and Configurators
    Bo Terje Kalsaas · IGLC 21, 2013 · PDF
  23. 2013
    Last Planner System Innovation Efforts on Requirements for Digital Management System
    Rein Terje Thorstensen, Bo Terje Kalsaas, John Skaar and Sigmund Jensen · IGLC 21, 2013 · PDF
  24. 2012
  25. 2012
    Waste in Construction: a Systematic Literature Review on Empirical Studies
    Daniela Dietz Viana, Carlos Torres Formoso and Bo Terje Kalsaas · IGLC 20, 2012 · PDF
  26. 2011
  27. 2011
    Conceptualization of Interdependency and Coordination Between Construction Tasks
    Bo Terje Kalsaas and Rafael Sacks · IGLC 19, 2011 · PDF
  28. 2011
    Discussion of Strategies for Measuring Workflow in Construction
    Trond Bølviken and Bo Terje Kalsaas · IGLC 19, 2011 · PDF
  29. 2011
    Integrated Inward Logistics and Construction Work and its Impact on Efficency in Production
    Bo Terje Kalsaas, Rein Terje Thorstensen, Andreas Grepperud, Halvard Hinlo, Sigmund Jensen and John Skaar · IGLC 19, 2011 · PDF
  30. 2010
    The Flow of Work in Construction: A Conceptual Discussion
    Bo Terje Kalsaas and Trond Bolviken · IGLC 18, 2010 · PDF
  31. 2010
    Work-Time Waste in Construction
    Bo Terje Kalsaas · IGLC 18, 2010 · PDF
  32. 2009
    Implementation of Last Planner in a Medium-Sized Construction Site
    Bo Terje Kalsaas, John Skaar and Rein Terje Thorstensen · IGLC 17, 2009 · PDF