Authors

John Skaar

13 papers at 11 conferences, 2009–2025.

  1. 2025
    What Types of Problem-Solving are Used in the Last Planner System?
    Trond Bølviken, John Skaar, Bo Terje Kalsaas and Lauri Koskela · IGLC 33, 2025 · PDF
  2. 2025
    Revitalizing Language Action in the Last Planner System™
    John Skaar, Trond Bølviken and Bo Terje Kalsaas · IGLC 33, 2025 · PDF
  3. 2023
    What Does a Commitment to a Plan Mean?
    John Skaar, Trond Bølviken, Bo Terje Kalsaas and Lauri Koskela · IGLC 31, 2023 · PDF
  4. 2022
    The Dual Nature of Complexity in Construction Management–Call for a Renewed Debate
    Bo Terje Kalsaas, Trond Bølviken and John Skaar · IGLC 30, 2022 · PDF
  5. 2022
  6. 2021
    The Importance of Alignment
    John Skaar and Bo Terje Kalsaas · IGLC 29, 2021 · PDF · Slides
  7. 2020
    Principles as a Bridge Between Theory and Practice
    John Skaar, Trond Bølviken, Lauri Koskela and Bo Terje Kalsaas · IGLC 28, 2020 · PDF · Slides
  8. 2019
    The Power of Lean Principles
    John Skaar · IGLC 27, 2019 · PDF · Slides
  9. 2018
    Transformation From Design-Bid-Build to Design-Build Contracts in Road Construction
    Bo Terje Kalsaas, Gøril Hannås, Grethe Frislie and John Skaar · IGLC 26, 2018 · PDF
  10. 2015
    Pull vs. Push in Construction Work Informed by Last Planner
    Bo Terje Kalsaas, John Skaar and Rein Terje Thorstensen · IGLC 23, 2015 · PDF
  11. 2013
    Last Planner System Innovation Efforts on Requirements for Digital Management System
    Rein Terje Thorstensen, Bo Terje Kalsaas, John Skaar and Sigmund Jensen · IGLC 21, 2013 · PDF
  12. 2011
    Integrated Inward Logistics and Construction Work and its Impact on Efficency in Production
    Bo Terje Kalsaas, Rein Terje Thorstensen, Andreas Grepperud, Halvard Hinlo, Sigmund Jensen and John Skaar · IGLC 19, 2011 · PDF
  13. 2009
    Implementation of Last Planner in a Medium-Sized Construction Site
    Bo Terje Kalsaas, John Skaar and Rein Terje Thorstensen · IGLC 17, 2009 · PDF