Tactical Obeyas for production control: visual management with Kaizen, Takt & LPS
- Founder &; Advisor, Upscale Performance, jonlerche@gmail.com, Denmark, orcid.org/0000-0001-7076-9630
- PhD Candidate, M.Sc. Eng. at Federal University of Rio Grande do Sul; Founding-Partner at Climb Consulting Group, Porto Alegre, Brazil, bernardo@climbgroup.com.br, orcid.org/0000-0002-3037-5597
https://doi.org/10.24928/2026/0119
Abstract
Offshore wind turbine pre-assembly is a high-stakes construction environment characterised by extreme logistical complexity, crane-dependent operations, and tight vessel/weather constraints where time is the primary currency. Despite the increasing adoption of Lean Construction approaches such as the Last Planner System (LPS) and Obeya rooms, current implementations often lack the operational distinction among management levels needed for tactical production control at the site level. This paper employs a Design Science Research (DSR) approach to develop and evaluate a multi-layered Visual Management (VM) artefact. This Tactical Obeya system integrates (1) a takt production line, (2) LPS make ready, (3) an integrated deviation management layer linking safety, quality, and technical constraints to quantified flow interruptions, and (4) Kaizen layer introducing continuous improvements. The artefact shifts management emphasis from reactive output reporting toward proactive input verification and commitment-based coordination (“Reliable Promising”), enabling collective blocker removal and escalation to strategic kaizen improvement events. The theoretical analysis explains how the system reduces flow variability and enhances value delivery to the installation vessel. Initial evaluation indicates improved predictability and stability sufficient to support a reduction trajectory from a volatile 28-day average loadout cycle toward a consistent 20-day target, enabled by continuous feedback loops and structured deviation learning.
Keywords
- Constraint analysis
- Kaizen
- Last Planner System
- Takt Planning
- visual management.
Cite this paper
APA 7th edition
Lerche, J., & Etges, B. M. B. S. (2026). Tactical Obeyas for production control: visual management with Kaizen, Takt & LPS. In F. Hamzeh, M. Poshdar, N. P. Garcia-Lopez, & V. Gan (Eds.), Proceedings of the 34th Annual Conference of the International Group for Lean Construction (IGLC 34) (pp. 1487–1498). https://doi.org/10.24928/2026/0119
Shortened reference for IGLC papers
Lerche, J., & Etges, B. M. B. S. (2026). Tactical Obeyas for production control: visual management with Kaizen, Takt & LPS. IGLC34. https://doi.org/10.24928/2026/0119