-
2018
Combining Takt Planning With Prefabrication for Industrialized ConstructionKrishna Chauhan, Antti Peltokorpi, Olli Seppänen and Klas Berghede · IGLC 26, 2018 · PDF
-
2017
A Framework of Five-Stream Production System for MegaprojectsMichael W. Ibrahim, Klas Berghede, David Thomack, Panos Lampsas, Dave Kievet and Awad S Hanna · IGLC 25, 2017 · PDF
-
2014
Supporting Organizational Design Towards Lean With the Viable System ModelMichael T. Schmidt, Fatos Elezi, Iris D. Tommelein, Klas Berghede and Udo Lindemann · IGLC 22, 2014 · PDF
-
2014
Developing a Production System on IPD: Considerations for a Pluralistic EnvironmentPatricia Tillmann, Klas Berghede, Glenn Ballard and Iris D. Tommelein · IGLC 22, 2014 · PDF
-
2014
Takt-Time Planning and the Last PlannerAdam Frandson, Klas Berghede and Iris D. Tommelein · IGLC 22, 2014 · PDF
-
2013
Takt Time Planning for Construction of Exterior CladdingAdam Frandson, Klas Berghede and Iris D Tommelein · IGLC 21, 2013 · PDF
-
2013
An Experiment in Takt Time Planning Applied to Non-Repetitive WorkMeeli Linnik, Klas Berghede and Glenn Ballard · IGLC 21, 2013 · PDF