Iris D. Tommelein
114 papers at 29 conferences, 1997–2026.
ORCID 0000-0002-9941-6596
Also published as Iris Tommelein, Iris D Tommelein.
-
2026
Developing a mistakeproofing mindset to increase safety capacityEugene H. Cheung, Tim Eigendorf, Tomisin Kehinde, Gregory F. Saragih and Iris D. Tommelein · IGLC 34, 2026 · PDF
-
2026
From Lean projects to Lean enterprise: using Hoshin Kanri to make Lean Construction stickRichardus N. Kasih, Iris D. Tommelein, Rafael V. Coelho, Richardus B. Utomo and Gerardus B. Kasih · IGLC 34, 2026 · PDF
-
2026
Performance measurement in Takt production: an exploratory study on metrics, practices and challengesCarlos T. Formoso, Carolina M. Zani, Karina B. Barth, Jeferson S. Shigaki, Gregory F. Saragih and Iris D. Tommelein · IGLC 34, 2026 · PDF
-
2026
Parade of Trades with transfer batchingGregory F. Saragih and Iris D. Tommelein · IGLC 34, 2026 · PDF
-
2025
Exploring IGLC Literature on SubcontractingGregory F. Saragih, Rafael V. Coelho, Richardus N. Kasih, Wataru Kon and Iris D. Tommelein · IGLC 33, 2025 · PDF
-
2025
Exploring Opportunities for Integrating Target Value Delivery and Front-end Planning in Industrial MegaprojectsRichardus N. Kasih, Iris D. Tommelein, Rafael V. Coelho, Gregory F. Saragih, Wataru Kon, Richardus B. Utomo and Gerardus B. Kasih · IGLC 33, 2025 · PDF
-
2025
Strategic Takt PlanningIris D. Tommelein and Samir Emdanat · IGLC 33, 2025 · PDF
-
2025
Takt Control: Core Concepts and Preliminary PropositionsCarlos T. Formoso, Iris D. Tommelein, Karina B. Barth and Rafael V. Coelho · IGLC 33, 2025 · PDF
-
2025
The Hidden Lean: Lessons From JapanWataru Kon, Iris D. Tommelein, Gregory F. Saragih, Richardus N. Kasih and Rafael V. Coelho · IGLC 33, 2025 · PDF
-
2024
No Single Takt Planning Method Fits All ProjectsIris D. Tommelein, Rafael V. Coelho, Carlos T. Formoso, Karina B. Barth and Fabrício Berger de Vargas · IGLC 32, 2024 · PDF
-
2024
About Time-Cost Trade-Offs in Takt PlanningIris D. Tommelein · IGLC 32, 2024 · PDF
-
2024
Application of the Work Density Method to in-Situ Pile Production in Heavy Civil EngineeringAnne Fischer, Philipp Baumgartner, Iris D. Tommelein, Konrad Nübel and Johannes Fottner · IGLC 32, 2024 · PDF
-
2024
Revisiting the Takt Maturity Model After Three International Takt ForumsJaakko Riekki, Joonas Lehtovaara, Iris D. Tommelein, Olli Seppänen and Aleksi Heinonen · IGLC 32, 2024 · PDF
-
2024
Mass Customized Products for Industrialized Construction: Challenges and OpportunitiesManoela Conte, Iris D. Tommelein, Carlos Torres Formoso and Randall Miller · IGLC 32, 2024 · PDF
-
2023
Features of a Behavior-Based Quality System (BBQS)Sulyn Gomez, Semich Chousein, Iris D. Tommelein, Glenn Ballard, Ralph Romayor, Michelle Diaz, Paz Arroyo and Safak Tekin · IGLC 31, 2023 · PDF
-
2023
Investigation of the Supply Chain of Mass Timber SystemsRafael V. Coelho, Aaron K. Anderson and Iris D. Tommelein · IGLC 31, 2023 · PDF
-
2023
Workload Leveling Metrics for Location-Based Process DesignVishesh V. Singh and Iris D. Tommelein · IGLC 31, 2023 · PDF
-
2023
Comparison of Takt Planning Methods Used on Projects of Different TypesIris D. Tommelein and Jon Lerche · IGLC 31, 2023 · PDF
-
2022
How a Takt Plan Can Fail: Applying Failure Modes and Effects Analysis in Takt ControlJoonas Lehtovaara, Iris D. Tommelein and Olli Seppänen · IGLC 30, 2022 · PDF
-
2022
Takt Planning: An Enabler for Lean ConstructionIris D. Tommelein and Samir Emdanat · IGLC 30, 2022 · PDF
-
2022
So Many Flows!Iris D. Tommelein, Vishesh V. Singh, Rafael V. Coelho and Joonas Lehtovaara · IGLC 30, 2022 · PDF
- 2021
- 2021
- 2021
- 2021
- 2020
- 2020
- 2020
-
2019
Changing Behaviors Upstream to Achieve Expected OutcomesSulyn Gomez, Raymond Huynh, Paz Arroyo, Glenn Ballard, Iris Tommelein and Patricia Tillmann · IGLC 27, 2019 · PDF
- 2019
- 2019
-
2018
Process-Based Cost Modeling Framework and Case StudyHung V. Nguyen, Iris D. Tommelein and Paul Martin · IGLC 26, 2018 · PDF
-
2018
Towards Facility Management Participation in Design: A UCSF Case StudyAudrey M. Bascoul, Iris D. Tommelein, Patricia Tillmann and Scott Muxen · IGLC 26, 2018 · PDF
-
2018
Managing the “Receding Edge”Camille Salem, Cecile Lefèvre, Jun Li, Ruth Waters, Iris D. Tommelein, Eshan Jayamanne and Patrick Shuler · IGLC 26, 2018 · PDF
-
2017
Integration of Lean and Information Technology to Enable a Customization Strategy in Affordable HousingEder Martinez, Iris D. Tommelein and Ariana Alvear · IGLC 25, 2017 · PDF
-
2017
Visualizing Daily On-site Space UseAudrey M. Bascoul and Iris D. Tommelein · IGLC 25, 2017 · PDF
-
2017
Collaborative Takt Time Planning of Non-Repetitive WorkIris D. Tommelein · IGLC 25, 2017 · PDF
-
2016
Takt Time Planning of Interiors on a Pre-Cast Hospital ProjectAdam G. Frandson and Iris D. Tommelein · IGLC 24, 2016 · PDF
-
2016
Product Versus Performance Specification for Wheelchair Ramp ConstructionNigel Blampied and Iris D. Tommelein · IGLC 24, 2016 · PDF
-
2016
What “Makes” the Last Planner? A Typology of Behavioral Patterns of Last PlannersSigmund Aslesen and Iris D. Tommelein · IGLC 24, 2016 · PDF
-
2015
Comparison Between Location Based Management and Takt Time PlanningAdam G. Frandson, Olli Seppänen and Iris D. Tommelein · IGLC 23, 2015 · PDF
-
2015
Formwork Standardization and Production Flow: Lessons From an Affordable Housing Project in EcuadorEder H. Martinez, Ariana M. Alvear, Iris D. Tommelein and Glenn Ballard · IGLC 23, 2015 · PDF
-
2015
Improving Integrated Planning for Offshore O&M Projects With Last Planner® PrinciplesAdam G. Frandson and Iris D. Tommelein · IGLC 23, 2015 · PDF
-
2015
Analysis of HVAC Subcontractor Mechanisms for JIT Materials Supply to a Construction SiteDaniela Viana, Patrícia Tillmann, Zach Sargent, Iris Tommelein and Carlos Formoso · IGLC 23, 2015 · PDF
-
2015
An Analysis of Potential Misalignments of Commercial Incentives in Integrated Project Delivery and Target Value DesignDoanh Do, Glenn Ballard and Iris D. Tommelein · IGLC 23, 2015 · PDF
-
2015
BIM and Lean in the Design-Production Interface of ETO Components in Complex ProjectsPatricia Tillmann, Daniela Viana, Zach Sargent, Iris Tommelein and Carlos Formoso · IGLC 23, 2015 · PDF
-
2014
Supporting Organizational Design Towards Lean With the Viable System ModelMichael T. Schmidt, Fatos Elezi, Iris D. Tommelein, Klas Berghede and Udo Lindemann · IGLC 22, 2014 · PDF
-
2014
Target Value Design as a Method for Controlling Project Cost OverrunsDoanh Do, Chao Chen, Glenn Ballard and Iris D. Tommelein · IGLC 22, 2014 · PDF
-
2014
Developing a Production System on IPD: Considerations for a Pluralistic EnvironmentPatricia Tillmann, Klas Berghede, Glenn Ballard and Iris D. Tommelein · IGLC 22, 2014 · PDF
-
2014
Choosing By Advantages and Rhetoric in Building Design: Relationship and Potential SynergiesPaz Arroyo, Glenn Ballard and Iris D. Tommelein · IGLC 22, 2014 · PDF
-
2014
Comparing Weighting Rating and Calculating vs. Choosing by Advantages to Make Design ChoicesPaz Arroyo, Iris D. Tommelein and Glenn Ballard · IGLC 22, 2014 · PDF
-
2014
Takt-Time Planning and the Last PlannerAdam Frandson, Klas Berghede and Iris D. Tommelein · IGLC 22, 2014 · PDF
-
2014
Automatic Generation of a Daily Space ScheduleAdam G Frandson and Iris D. Tommelein · IGLC 22, 2014 · PDF
-
2014
A Mentoring Approach to Implement Lean ConstructionPatricia Tillmann, Glenn Ballard and Iris Tommelein · IGLC 22, 2014 · PDF
-
2013
Management Cybernetics as a Theoretical Basis for Lean ThinkingTobias Steinhaeusser, Fatos Elezi, Iris D. Tommelein and Udo Lindemann · IGLC 21, 2013 · PDF
-
2013
Using 'Choosing by Advantages' to Select Tile From a Global Sustainable PerspectivePaz Arroyo, Iris D. Tommelein and Glenn Ballard · IGLC 21, 2013 · PDF
-
2013
Social Network Analysis of Information Flow in an IPD-ProjectGernot Hickethier, Iris D. Tommelein and Baris Lostuvali · IGLC 21, 2013 · PDF
-
2013
Takt Time Planning for Construction of Exterior CladdingAdam Frandson, Klas Berghede and Iris D Tommelein · IGLC 21, 2013 · PDF
-
2012
Deciding a Sustainable Alternative by Choosing by Advantages' in the AEC industryPaz Arroyo, Iris D. Tommelein and Glenn Ballard · IGLC 20, 2012 · PDF
-
2012
Reducing Rework in Design by Comparing Structural Complexity using a multi domain matrixGernot Hickethier, Iris D. Tommelein and Fritz Gehbauer · IGLC 20, 2012 · PDF
-
2012
Root Causes of Clashes in Building Information ModelsIris D. Tommelein and Sepide Gholami · IGLC 20, 2012 · PDF
-
2011
Collaborating with a Permitting Agency to Deliver a Healthcare Project: Case Study of the Sutter Medical Center Castro Valley (SMCCV)Isabel Alarcon, Digby Christian and Iris D. Tommelein · IGLC 19, 2011 · PDF
-
2010
Lean Design Management in an Infrastructure Design-Build Project: A Case StudyHyun Woo Lee, Iris D. Tommelein and Glenn Ballard · IGLC 18, 2010 · PDF
-
2010
Explorative Application of the Multi-Domain Matrix Methodology in Lean DesignFabian A. Furtmeier and Iris D. Tommelein · IGLC 18, 2010 · PDF
-
2009
Is the Last Planner System Applicable to Design? A Case StudyFarook R. Hamzeh, Glenn Ballard and Iris D Tommelein · IGLC 17, 2009 · PDF
-
2009
Setplan: A Computer Tool to Aid in Set-Based DesignJohn-Michael Wong, Kristen Parrish, Iris D. Tommelein and Bozidar Stojadinovic · IGLC 17, 2009 · PDF
-
2009
The Economic Theory of Production Conceals Opportunities for Sustainability ImprovementLauri Koskela and Iris D. Tommelein · IGLC 17, 2009 · PDF
-
2009
Development of an Integrated Facade System to Improve the High-Rise Building ProcessFredrik Friblick, Iris D. Tommelein, Edith Mueller and Jon Henrik Falk · IGLC 17, 2009 · PDF
-
2009
Decision Analysis Using Virtual First-Run Study of a Viscous Damping Wall SystemHung V. Nguyen, Baris Lostuvali and Iris D. Tommelein · IGLC 17, 2009 · PDF
-
2009
Causes of Rework in California Hospital Design and Permitting: Augmenting an Existing TaxonomyPeter P. Feng and Iris D. Tommelein · IGLC 17, 2009 · PDF
-
2009
Making Design Decisions Using Choosing by AdvantagesKristen Parrish and Iris D. Tommelein · IGLC 17, 2009 · PDF
-
2009
Framework for Using A3s to Develop Shared Understanding on ProjectsArjun P. Gupta, Iris D. Tommelein and Katherine Blume · IGLC 17, 2009 · PDF
-
2008
‘Poka Yoke’ or Quality by Mistake Proofing Design and Construction SystemsIris D. Tommelein · IGLC 16, 2008 · PDF
-
2008
Using Controlled Experiments to Calibrate Computer Models: The Airplane Game as a Lean Simulation ExerciseZofia K. Rybkowski, John-Michael Wong, Glenn Ballard and Iris D. Tommelein · IGLC 16, 2008 · PDF
-
2008
Set-Based Design: Case Study on Innovative Hospital DesignKristen Parrish, John-Michael Wong, Iris D. Tommelein and Bozidar Stojadinovic · IGLC 16, 2008 · PDF
-
2008
Design Structure Matrix (DSM) Implementation on a Seismic RetrofitStan J. Tuholski and Iris D. Tommelein · IGLC 16, 2008 · PDF
-
2008
Value Propositions for Set-Based Design of Reinforced Concrete StructuresKristen Parrish, John-Michael Wong, Iris D. Tommelein and Bozidar Stojadinovic · IGLC 16, 2008 · PDF
-
2008
Process-Based Cost Modeling to Support Lean Project DeliveryHung V. Nguyen, Iris D. Tommelein and Glenn Ballard · IGLC 16, 2008 · PDF
-
2008
Improving Construction Work Flow – The Connective Role of Lookahead PlanningFarook R. Hamzeh, Glenn Ballard and Iris D. Tommelein · IGLC 16, 2008 · PDF
-
2008
Modeling the Effect of Rework Timing: Case Study of a Mechanical ContractorPeter P. Feng, Iris D. Tommelein and Lawrence Booth · IGLC 16, 2008 · PDF
-
2007
Logistics Centers to Support Project-Based Production in the Construction IndustryFarook R. Hamzeh, Iris D. Tommelein, Glenn Ballard and Philip M. Kaminsky · IGLC 15, 2007 · PDF
-
2007
Exploration of Set-Based Design for Reinforced Concrete StructuresKristen Parrish, John-Michael Wong, Iris D. Tommelein and Bozidar Stojadinovic · IGLC 15, 2007 · PDF
-
2007
Priority Conversations: A Case Study on Priority WallsMikati Samir O., Timothy G. Roller, Iris D. Tommelein and Atul Khanzode · IGLC 15, 2007 · PDF
-
2006
Process Benefits From Use of Standard Products – Simulation Experiments Using the Pipe Spool ModelIris D. Tommelein · IGLC 14, 2006 · PDF
-
2006
Investigation of Buffer Dynamics in Sheet Metal Ductwork Supply ChainsThais da C. L. Alves and Iris D. Tommelein · IGLC 14, 2006 · PDF
-
2006
Simulation as a Tool for Production System Design in ConstructionThais da C.L. Alves, Iris D. Tommelein and Glenn Ballard · IGLC 14, 2006 · PDF
-
2004
Simulation of Buffering and Batching Practices in the Interface Detailing-Fabrication-Installation of HVAC DuctworkThais da C.L. Alves and Iris D. Tommelein · IGLC 12, 2004 · PDF
-
2004
Improving the Delivery Process for Engineered-To-Order Products - Lessons Learned from Power Distribution EquipmentJan A. Elfving, Iris D. Tommelein and Glenn Ballard · IGLC 12, 2004 · PDF
-
2004
Tolerance Mapping - Partition Wall Case RevisitedColin Milberg and Iris D. Tommelein · IGLC 12, 2004 · PDF
-
2004
Creating Work Structuring Transparency in Curtain Wall DesignCynthia C.Y. Tsao and Iris D. Tommelein · IGLC 12, 2004 · PDF
-
2004
Application of Lean Supply Chain Concepts to a Vertically-Integrated Company: A Case StudyNadia G. Akel, Iris D. Tommelein and J.C. Boyers · IGLC 12, 2004 · PDF
-
2003
Buffering and Batching Practices in the HVAC IndustryThais da C.L Alves and Iris D. Tommelein · IGLC 11, 2003 · PDF
-
2003
An International Comparison of the Delivery Process of Power Distribution EquipmentJan A. Elfving, Iris D. Tommelein and Glenn Ballard · IGLC 11, 2003 · PDF
-
2003
Application of Tolerance Analysis and Allocation to Work Structuring: Partition Wall CaseColin Milberg and Iris D. Tommelein · IGLC 11, 2003 · PDF
-
2002
Value Stream Analysis of Construction Supply Chains: Case Study on Pipe Supports Used in Power PlantsRoberto J. Arbulu and Iris D. Tommelein · IGLC 10, 2002 · PDF
-
2002
Alternative Supply-Chain Configurations for Engineered or Catalogued Made-to-Order Components: Case Study on Pipe Supports Used in Power PlantsRoberto J. Arbulu and Iris D. Tommelein · IGLC 10, 2002 · PDF
-
2002
Reducing Lead Time for Electrical SwitchgearJan Elfving, Iris D. Tommelein and Glenn Ballard · IGLC 10, 2002 · PDF
-
2002
Comparing and Implementing Alternative Work Structures - Installation of Door FramesCynthia C.Y. Tsao and Iris D. Tommelein · IGLC 10, 2002 · PDF
-
2001
Considerations for Streamlining a Vertically-Integrated Company - A Case StudyNadia G. Akel, Iris D. Tommelein, J.C. Boyers, Kenneth D. Walsh and James C. Hershauer · IGLC 9, 2001 · PDF
-
2001
Requirements and Barriers to Adoption of Last Planner Computer ToolsHyun Jeong Choo and Iris D. Tommelein · IGLC 9, 2001 · PDF
-
2001
Effects of a Preferred Vendor Relationship on an Electrical Component Supplier and Electrical Contractor - A Case StudyCaren A. Crutcher, Kenneth D. Walsh, James C. Hershauer and Iris D. Tommelein · IGLC 9, 2001 · PDF
-
2001
De-Coupling Cladding Installation From Other High-Rise Building Trades: A Case StudyIris D. Tommelein and Greg Beeche · IGLC 9, 2001 · PDF
-
2001
Integrated Product-Process Development by a Light Fixture ManufacturerCynthia C.Y. Tsao and Iris D. Tommelein · IGLC 9, 2001 · PDF
-
2001
Application of Design Rationale Systems to Project Definition – Establishing a Research ProjectMichael Whelton, Glenn Ballard and Iris Tommelein · IGLC 9, 2001 · PDF
-
2000
WorkMovePlan: Database for Distributed Planningand CoordinationHyun Jeong Choo and Iris D. Tommelein · IGLC 8, 2000 · PDF
-
2000
Integrating Design Planning, Scheduling, and Control With DePlanJamie Hammond, Hyun Jeong Choo, Simon Austin, Iris D. Tommelein and Glenn Ballard · IGLC 8, 2000 · PDF
-
2000
Materials and Information Flows for HVAC Ductwork Fabrication and Site InstallationMatt Holzemer, Iris D. Tommelein and Shih-Lun (Aaron) Lin · IGLC 8, 2000 · PDF
-
2000
Case Study for Work Structuring: Installation of Metal Door FramesCynthia C.Y. Tsao, Iris D. Tommelein, Eric Swanlund and Gregory A. Howell · IGLC 8, 2000 · PDF
-
1999
Just-in-Time Concrete Delivery: Mapping Alternatives for Vertical Supply Chain IntegrationIris D. Tommelein and Annie En Yi Li · IGLC 7, 1999 · PDF
-
1999
More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction ProcessesIris D. Tommelein and Markus Weissenberger · IGLC 7, 1999 · PDF
-
1999
Space Scheduling Using Flow AnalysisHyun Jeong Choo and Iris D. Tommelein · IGLC 7, 1999 · PDF
-
1998
Workplan: Database for Work Package Production SchedulingHyun Jeong Choo, Iris D. Tommelein, Glenn Ballard and Todd R. Zabelle · IGLC 6, 1998 · PDF
-
1998
Parade Game: Impact of Work Flow Variability on Succeeding Trade PerformanceIris D. Tommelein, David Riley and Greg A. Howell · IGLC 6, 1998 · PDF
-
1997
Discrete-Event Simulation of Lean Construction ProcessesIris D. Tommelein · IGLC 5, 1997 · PDF