Authors

Min Liu

15 papers at 11 conferences, 2008–2026.

ORCID 0000-0002-3070-7109

  1. 2026
    Analysis of suicide rates in construction and how lean can help reverse the trends
    Min Liu, Thais da C. L. Alves and Weilin He · IGLC 34, 2026 · PDF
  2. 2025
    Exploratory Study on Construction Workers Mental Health
    Thais da C. L. Alves, Min Liu, Chuanni He, Weilin He and Tejaswini Hegade · IGLC 33, 2025 · PDF
  3. 2023
    A Mechanism for Smart Contracts to Mediate Production Bottlenecks Under Constraints
    Gongfan Chen, Chuanni He, Simon M. Hsiang, Min Liu and Huaming Li · IGLC 31, 2023 · PDF
  4. 2023
    A Mechanism for Smart Contracts to Mediate Production Bottlenecks Under Constraints
    Gongfan Chen, Chuanni He, Simon M. Hsiang, Min Liu and Huaming Li · IGLC 31, 2023 · PDF
  5. 2021
    Project Delivery Contract Language, Schedules, and Collaboration
    Thais da C. L. Alves, Manuel Martinez, Min Liu and Natalie M. Scala · IGLC 29, 2021 · PDF · Slides
  6. 2021
    The Emergence and Growth of the on-Line Serious Games and Participatory Simulation Group “APLSO”
    Zofia K. Rybkowski, Thaís da C. L. Alves and Min Liu · IGLC 29, 2021 · PDF · Slides
  7. 2019
    Manager Perception and Decision for Making-Do in China v.s. In the U.S.
    Ashtad Javanmardi1, YuXiang Zhang, YanChun Liu, ShuJuan Yang, XiuXia Yu, Min Liu and Simon M. Hsiang · IGLC 27, 2019 · PDF
  8. 2018
    Constraint Removal and Work Plan Reliability: A Bridge Project Case Study
    Ashtad Javanmardi, S. Alireza Abbasian-Hosseini, Simon M. Hsiang and Min Liu · IGLC 26, 2018 · PDF
  9. 2015
    Social Network Analysis for Construction Specialty Trade Interference and Work Plan Reliability
    S. Alireza Abbasian-Hosseini, Min Liu and Simon M. Hsiang · IGLC 23, 2015 · PDF
  10. 2012
    The Oops Game: How Much Planning Is Enough?
    Gregory Howell and Min Liu · IGLC 20, 2012 · PDF
  11. 2012
    Causes of Time Buffer in Construction Project Task Durations
    Marion M. Russell, Greg Howell, Simon M. Hsiang and Min Liu · IGLC 20, 2012 · PDF
  12. 2011
  13. 2011
    A Case Study Into Task Variation and the Social Network of Construction Trades
    Brad W. Wambeke, Min Liu and Simon M. Hsiang · IGLC 19, 2011 · PDF
  14. 2009
    Factors Affecting Work Flow Reliability - A Case Study
    Min Liu and Glenn Ballard · IGLC 17, 2009 · PDF
  15. 2008
    Improving Labor Productivity Through Production Control
    Min Liu and Glenn Ballard · IGLC 16, 2008 · PDF